Be st Practice 1 0.8          The Post-Shipment Phase: Installation, Pre-Commissioning, Commissioning and Start-up Best Practices
       Oil flush acceptance


       The oil flush of the subject system has been conducted in
       accordance with site procedures and accepted.

        Date of flush __________ Time started __________ Time completed __________
        Inspected and accepted by __________ Date __________
        Owner __________
        Vendor representative __________
        Oil Flush Log
                        Sheet __of __
        System identification ____________ Inspector ___________
        Date     Time    Circulating   Discharge   Bearing/seal header      Reservoir     Filter in   Comments
                         pump No.      pressure    pressure    temperature  temperature   circulation







         Best Practice 10.8Practice 10.8
         Best
         Perform auxiliary system functional tests prior to start-up,  Lessons Learned
         to confirm proper installation; that site operation is in  Failure to completely check the functional operation of all
         agreement with vendor requirements, project specifica-  critical equipment train auxiliary systems prior to start-up
         tions and to obtain a baseline signature.          will result in delays and can reduce the reliability of the
           The following tests should be performed:         critical equipment train up to the first scheduled turnaround.
           Lube oil system
           Control oil system (if applicable)               Benchmarks
           Seal oil system (if applicable)
                                                            This best practice has been used since 1984; confirm the proper
           Dry gas seal system (if applicable)
                                                            functional operation of all critical equipment auxiliary systems prior to
           Governor system (if applicable)
                                                            start-up, and record a detailed record of initial settings and operational
                                                            characteristics for each auxiliary system. See an example of a baseline
           The functional test agendas should be prepared based on vendor
         factory test requirements and field operating requirements to confirm  auxiliary system record in the supporting information below.
         satisfactory steady state and transient operation.



       B.P. 10.8. Supporting Material                       will help significantly during the operation of the unit. The func-
                                                            tional test procedure should be carried out initially without the
       Functional testing                                   critical equipment running, and then with the auxiliary system
                                                            running as closely as possible to design operation conditions. The
       Having satisfactorily installed and flushed the auxiliary system,  functional test procedure should first require that all in-
       all auxiliary equipment should be functionally tested, and all  strumentation be properly calibrated before proceeding. Each
       instruments and controls checked for proper setting prior to  specific functional test requirement should then beperformed and
       operation of equipment. A functional test outline and procedure  the results noted. If they do not meet specified limits, testing
       is included at the end of this section. We will highlight the major  should stop, and components should be corrected at this point.
       considerations of the procedure at this time.        Each step should be followed thoroughly to ensure each compo-
          It is recommended that the console vendor and/or the equip-  nentmeets allrequirements.It isrecommended that theoperators
       ment purchaser prepare a detailed field functional test procedure  assigned to this particular unit should assist in functional testing to
       and calibration check form. The format of this procedure can  familiarize themselves with the operation of the system. In addi-
       follow the factory test procedure if this is acceptable. As a mini-  tion, site training courses should be conducted prior to the func-
       mum, the auxiliary system, bill of material, and schematic should  tional test to familiarize operators with the system’sbasic
       be thoroughly checked, in order to include the calibration and  functions. This training, again, significantly increases un-
       functional test of each major component in the auxiliary system.  derstanding of the equipment and ensures unit reliability.
       That is, components on consoles, and up at unit interfaces. A de-  Satisfactory acceptance of a functional test then ensures that
       tailedrecordshouldbekeptofthisfunctionaltestprocedureethis  the unit has been designed, manufactured, and installed