Testing a metal-enclosed bus system  32/953
        Testing a bus system is generally along similar lines to   of  the  leakage  current,  both  before  and  after  the
        those  for  a cwitchgear assembly, discussed  in  Chapter   dielectric test
         14. In this chapter  we discuss additional  tests that are   2 Verification of dielectric properties:
        specifically for a metal-enclosed bus system.    (i)  Power frequency voltage withstand or HV test
                                                         (ii)  Impulse voltage withstand test for system voltages
                                                             2.4 kV and above
        32.1  Philosophy of quality systems             3 Verification  of  temperature  rise  limits  (for  rated
                                                         continuous current capacity)
        This has been  covercd in Section  11.1.        4 Verification of  short-circuit strength:
                                                         (a) For straight lengths and tap-offs
        32.1.1  Quality assurance                        (b) For  the  tap-offs  in  a power-generating  station,
                                                            connecting a UAT through the main bus section
        To  fulfil  the  quality  requirements,  the  material  inputs   between  the  generator  and  the  generator
        going into the making of a bus system must be properly   transformer.
        checked as soon as they are received,            (c) For the ground bus in  isolated  phase bus (IPB)
                                                            systems
                                                        5 Verification of momentary peak or dynamic current
          Aluminium or copper  scctions  and  sheets  (for their
          cross-sectional areas. thickness of sheet, surface finish.   6 Verification of protective circuit
                                                        7 Verification of clearance and creepage distances
          bending properties and conductivity etc.)     8 Verification of degree of protection:
          Hardware (for proper size, quality of threads and tensile   (a)  Enclosure test
          strength etc.)                                 (b) Watertightness test - for all outdoor parts of any
          Insulators and supports (for sizes and quality of material)
                                                             bus  system  (but  for  outdoor  as  well  as  indoor
          Other  materials, components  or equipmcnt  used  for   parts for isolated phase bus (IPB) systems)
          making. inter-connections and bondings of such systems   (c)  Air  leakage  test,  for  isolated  phase  bus  (IPB)
          Cooling systems (in large current rating systems).
                                                             systems
                                                        9 Measurement of resistance and reactance
          All these items must be properly checked and recorded   IO Endurance of trunking system with trolley type tap-
        according to the manufacturer’s internal quality checks   off faci 1 i ties
        and formats before they are used in the manufacture of a   I  I  Additional test on an  IPB enclosure for radio inter-
        bus  system. This will eliminate  any  inconsistency in a   ference  as  in  NEMA-107.  The  maximum  radio
        material or component at the initial stage. Similarly, stage   influence voltage (RIV) should not exceed 100 pV at
        inspections  are  necessary  during  the  course  of  manu-   1000 kHz. For test equipment and test procedure refer
        facturing to ensure quality at every stage and to eliminate   to the Standard.
        incorrect construction and assembly or poor workmanship.
        And thus assure a product of desired specifications and   32.2.2  Routine tests
        quality.
                                                       Routine tests are conducted on each completed bus system,
        32.1.2 Purpose of testing                      irrespective  of  voltage,  current,  fault  level  and  con-
                                                       structional details and whether or not  it has undergone
        The purpose of  testing of  a bus system is to ensure its   type tests. The following will form routine tests:
        compliance with design parameters, material inputs and
        manufacturing consistency.                       To check for any human error
                                                         General inspection of  the bus assembly
        32.2  Recommended tests                          Inspection of electrical wiring if there is any (such as
                                                         for space heaters, cold or hot air blowing, enclosure
                                                         pressurizing or any other protective circuit)
        The following are the recommended  tests that may  be   Verification of  insulation resistance or measurement
        carried out on a completed  bus duct, as in  IEC  60298,   of  the  leakage  current,  both  before  and  after  the
        ANSI C-37/20C. IEC 60694 and BS 159 for both LT and   dielectric HV test
        HT systems.                                      Verification of dielectric properties - limited to power
                                                         frequency voltage withstand test or HV test
        32.2.1  Type tests                               Additional tests for an IPB system are:
                                                         (a) Partial discharge test: On all cast resin components
        Type tests are conducted on the first assembly (bus system)   such  as  instrument  transformers,  bushings  and
        of each voltage, current rating and fault level to demon-   insulators to ensure that the insulation is free from
        strate compliance  with the electrical and constructional   defects and voids.
        design parameters. The tests provide a standard reference   (b) Checking of welded joints: as in GDCD-198. norms
        for  any  subsequent  assembly  with  similar  ratings  and   for aluminium welding (CEGB. UK)*: All shop-
        constructional detailh.  The following tests are conducted:
          1  Verification of insulation resistance or measurement   *Central  Electricity  Generating Board. U K