32/958 Industrial Power Engineering and Applications Handbook
        where ZR, Zy, IB are the phase currents in the three phases   The procedure for tests and the requirements of the test
                                                      results will remain the same as for the type tests,
                         "'
                                per
        :.  Impedance,  Z = - phase/rn
                             i2
                        Iph  '
                                                      32.5  Field tests
        and         R=-       Q per phaselm
                        3Zih . L
                                                       These  are generally  the  same as the routine  tests.  No
        and         X = 4-       R  per phase/m        field test as regards the power frequency voltage withstand
                                                       or HV test is normally prescribed on a bus system, which
        where                                          has  already  been  tested  at  the  manufacturer's  works.
        P = total power input in watts                 Repeated application of high voltage may deteriorate the
        L = length of the bus section on which the voltage drop   insulating properties of the insulation system and its life
           has been measured in metres                 unless modification has been carried out at site or where
                                                       the  insulation  of  joints  between  the  busbars  can  be
        32.3.11  Endurance of trunking system with     completed  only  after erection  at site. In  such cases, if
               trolley-type tap-off facilities         this test becomes essential it can be conducted,

        This test is generally applicable to an LT overhead busbar   At  85%  of  the  test  values  in  Table  32.1(A)  for  LT
        system or rising mains which have sliding-type plug-in   systems, applied for 1 minute.
        boxes for outgoing terminations (Figures 28.3 and 28.4(a)).   Or  at  80% of  the  test  values  for  HT  systems  for
        The sliding contacts carrying their rated current at rated   1 minute.
        voltage must be able to operate at least  10 000 times to   Or  a  d.c.  voltage  as  in  Table  32.1(B)  applied  for
        and fro with the trunking conductors. A successful test   15 minutes as in IS 8084.
        should reveal no mechanical or electrical defect such as   Or at 75% of the test values in Table 32.2, for series I1
        pitting, burning or welding of  contacts.       voltage systems according to ANSI C-37/20C.

                                                       Note
        32.4  Routine tests                            If it is not possible to carry out the test at 75%, 80% or 85% of the
                                                       test values, as prescribed above or for some reasons the test duration
                                                       may  have  to  be  increased by  more  than  one  minute,  then  it  is
        The tests against step numbers 1,2 and 3 are of a general   permissible for the Lest voltage to be further reduced to suit the site
        nature and no test procedure is prescribed for these. The   and instead, the test duration increased  The reduced test voltages
        remainder  have already been covered under type tests.   for longer test durations are provided in Table 14.8.

                                              Relevant Standards
        IEC

        602981 1990      A.C. metal enclosed  switchgear and controlgear for rated voltages   3427/1991   BS EN
                         above kV and up to and including 52 kV                        60298/ 1996
        60439-211987     Specification for low voltage switchgear and controlgear assemblies   8623-2/1993   BS EN 60439-
                         Particular requirements for busbars trunking systems (busways)   2/1993
        6069411996       Common specifications for high voltage switchgear and   3427/ 199 1   BS EN
                         controlgear Standards                                         60694/1997
                         Specification  for high voltage busbars  and busbar connections   8084- 1992   BS  159/1992

                                    Relevant US Standards ANSVNEMA and IEEE
                                                                             ~   ~~~
        NEMA  107/1993   Method of measurement  of Radio Influence Voltage (RIV) of HV apparatus
        ANSMEEE-C-37-    Metal enclosed bus and Guide for calculating losses in isolated phase bus.
        23/1992
        ANSI/IEEE-C37.24/   Guide for evaluating the effect of solar radiation on outdoor metal enclosed  switchgear
        1986
        Notes
        1  In the tables of Relevant Standards in this book while the latest editions of the Standards are provided, it is possible that revised editions
           have become available. With the advances of technology and/or its application,  the updating of Standards is a continuous process by
           different Standards organizations. It  is therefore advisable that  for more  authentic references,  readers should consult the relevant
           organizations for the latest version of a Standard.
        2   Some of the BS or IS Standards mentioned against IEC may not be identical
        3   The year noted against each Standard may also refer to the year of its last amendment  and not necessarily  the year of publication.