Page 289 - Petroleum Production Engineering, A Computer-Assisted Approach
P. 289
Guo, Boyun / Petroleum Production Engineering, A Computer-Assisted Approach Index Final Proof page 288 28.12.2006 10:57am
288 INDEX
V 12/159, 13/182–185, 14/208–214, 15/225–235, 16/244,
Valves, 1/6–8, 1/10, 10/119–120, 10/126, 11/136, 13/181–183, 17/252, 18/267–269
13/188–201, 13/203–205, 18/279 deliverability, 1/1, 3/30, 6/69–71, 6/73, 6/76–77, 6/79, 6/81–84,
Velocity, 1/8, 1/11, 4/46–47, 4/49, 4/52–53, 5/60–63, 10/121, 13/205, 15/228–229, 17/264, 18/268
10/126, 10/137–138, 11/144–145, 11/154, 12/165, 13/188, operation, 14/219
13/203, 14/216, 14/218–220, 15/231–237, 15/240, 16/248 productivity, 1/4, 3/42, 12/172, 15/228–230, 16/244, 17/257–258,
Vertical lift performance (VLP), 4/46, 13/183 17/264,
Viscosity, 2/20–21, 2/23–24, 2/26, 3/30, 3/33–35, 3/39–40, 4/46, test, 15/241, 17/263
4/48, 4/52–54, 4/58, 5/61, 6/74–76, 6/78, 6/80, 6/82–83, 7/88, Wellbore flow, 4/46, 6/70
7/93, 7/95, 10/127, 11/144, 11/147, 12/172, 13/187, 13/200, Wellhead, 1/4–7, 1/9, 1/13, 1/15, 3/30, 3/37, 4/46, 4/50–51, 5/60,
14/209–210, 14/212–213, 14/215, 15/229, 15/231, 5/63–64, 6/70–72, 6/74–82, 6/84, 7/93, 10/127, 11/150–151,
16/246–247, 17/254–255, 17/258–260 12/173, 13/184–185, 13/198–199, 13/201, 13/205, 14/210,
14/212–214, 14/216, 14/219, 15/232, 15/237, 15/240–241,
W 18/268, 18/270, 18/279
Wall thickness, 1/11, 9/110, 11/148–152, 11/154 Weymouth equation, 11/146–148, 13/187, 18/272–273
Water, 1/4 Wormhole, 16/247–248
coning, 15/230–231, 15/238
flow, 13/183, 15/237 Y
production, 4/50–52, 4/57, 9/112, 13/202, 15/227–228, 15/231, Yield stress, 9/110–112
15/237–238, 15/240, 18/279
Well, 1/5–9, 2/20–21, 3/30–43, 4/46, 4/55, 5/60, 6/69–71, Z
7/88–90, 8/98–99, 8/101, 9/107, 10/118–122, 11/153, Z-factor, 2/23–25, 5/65, 7/92–93, 11/146, 13/188, 14/220