PRACTICAL CONSIDERATIONS FOR FRACTURE TREATMENT DESIGN
1 .oo
0.95
0.90
0.85
0.80
C 0.75
0.70
0.65
0.60
0’55 J
0.50
0 1 2 3 4 5 6
Time (hr)
Figure P-17-n’ for 60 Ib/lOOO gal zirconate-crosslinked fluid.
0 1 2 3 4 5 6
Time (hr)
Figure P-18--K‘ for 60 Ib/lOOO gal zirconate-crosslinked fluid.
P-19