Page 239 - Advanced Gas Turbine Cycles
P. 239

Subject Index                         20 I

        Ruston TB gaq turbine, 177, 180         injection turbine plants (STIG), 85-86
        RWI cycle, 100, 101, 103, 105, 106        intercooled, 97-98,  103, 105
        RWI see recuperated water injection       recuperation, 91 -94,  133, 149- 150
                                                  thermodynamics,  103
        Safety factor (cooling), 186            reforming reactions,  143, 144, 148
        Scrubbing process, 147- 148             thermo-chemical recuperation, 133, 143,
        Semi-closure cycles, 134, 140-  141, 146- 148,   149, 150
                157, 159-162                    turbines,  128
        Semi-closed CBT or CCGT,  134         Steam cooling of the gas turbine,  128
        Semi-closed CCGT plant with C02 removal,   Steam injection and water injection plants,
                163, 164                             86
        Semi-closed CICBTBTX cycle, 135       STIG and EGT, 85,97, 103
        Semi-closure, 139, 140, 158           STIG cycle, 96, 97, 99, 103, 107
        Sequestration, 132, 134, 145-148      Stoichiometric limit, 47
        Shift reactor, 161 -162               STIG see steam injection turbine plants
        Simple CHT cycle, 34                  Sulphuric acid dewpoint, 122
        Simple EGT, 93, 96, 107               Supplementary combustion, 172
        Simple PO plant, 155                  Supplementary firing, 116, 173
        Single pressure system, 122- 123      Supplementary fired CHP plant, 172
        Simple single pressure system with feed heating,  Supplementary  ‘heat supplied’, 120
               122                            Surface intercoolers, 105
        Simple single pressure system without feed   Syngas, 114-115,  136, 143-144,  161-162
               heating,  118
        Single pressure steam cycle with LP evaporator  Taxes, 131, 162-164,  191, 192-194
               in a pre-heating loop,  123   Tax rates,  190
        Single pressure steam raising, 121   TBC (Thermal barrier coating), 185
        Single-step turbine cooling, 49-5  1, 55-57,   TCR, 133, 141-143,  147-152,  157
               73-75,76-78                   TCR see thermo-chemical recuperation
        Specific enthalpy, 24                Temperature
        Specific entropy, 24                    adiabatic wall,  185
        Specific heat, 35,41-42,  43, 88        ambient, 13-14,  24
        Specific work                           changes, 39,42-43
          closed air standard cycles, 35        combustion, 47-49,55-57,68,73-84
          combined cycles, 123-124              dewpoint, 114, 119, 122
          open circuit plants, 45-46            difference ratio, 71-72,  185, 187
          steam-thermo-chemical recuperation, 150,   economiser water entry, 119
               151                              exit turbine, 59
          wet gas turbine plants, 104-107       isentropic ratio, 35-39,  43, 66-67,
        Stack temperature, 1 19                      92-93
        Stagnation pressurdtemperature, 60,61-65,183   IS0 firing, 47
        Stanton numbers,  183, 184-185,  186    mean, 8, 21
        Stationary entry nozzle guide vane row, 60-65   pinch point, 1 18
        Steady-flow,  I,  13                    power generation, 8-9
          availability function, 14, 15, 23, 24   process steam, 177, 178
          energy equation, 13, 85, 87, 91,  172   rotor inlet, 47-54,  56-57,  65-68
        Steam                                   stack, 118
          air ratios, 87-89,  150               stagnation, 60, 61 -65,  I83
          enthalpy, 119                         turbine entry, 50, 58
   234   235   236   237   238   239   240   241   242   243   244