Page 97 - Advances In Productive, Safe, and Responsible Coal Mining
P. 97

Optimization of coal recovery and production rate as a function of panel dimensions  81

           References


            [1] Tien J. Room-and-pillar mining in coal. In: Darling P, editor. SME mining engineering
               handbook. Littleton, CO: Society for Mining, Metallurgy and Exploration, Inc.; 2011.
               p. 1339–46.
            [2] Anani A, Awuah-Offei K, Hirschi JC. Application of discrete event simulation in optimi-
               sing coal mine room-and-pillar panel width: a case study, Min Technol 2016;126:1–9.
               Available from: http://www.tandfonline.com/doi/full/10.1080/14749009.2016.1195035.
            [3] Fortune JAB, Crawshaw SAM. Developments in the application of underground battery
               vehicles in the UK coal mining industry. Min Technol 1996;78(902):263–9.
            [4] Schatz RS, Nieto A, Dogruoz C, Lvov SN. Using modern battery systems in light duty
               mining vehicles. Int J Min Reclam Environ 2015;29(4):243–65.
            [5] Chugh YP, Pytel W. In: Development of alternate room-and-pillar mining geometries for
               improved extraction and ground control in coal and copper mines. Proceedings of the thir-
               teenth international symposium on mine planning and equipment selection. Wroclaw:
               CRC Press; 2004. p. 223.
            [6] Hirschi JC. A dynamic programming approach to identifying optimal mining sequences
               for continuous miner coal production systems [PhD dissertation]. Southern Illinois
               University-Carbondale; 2012.
            [7] Infomine USA Inc. Mine and mill equipment costs. Spokane Valley, WA: Infomine USA
               Inc.; 2013.
            [8] Haessler RW. One-dimensional cutting stock problems and solution procedures. Math
               Comput Model 1992;16(1):1–8.
            [9] Awuah-Offei K, Osei B, Askari-Nasab H. Modeling truck/shovel energy efficiency under
               uncertainty. Trans Soc Min Metall Explor 2011;330:573–84.
           [10] Kelton WD, Sadowski RP, Swets NB. Simulation with arena. 5th ed. New York, NY:
               McGraw-Hill; 2009.
           [11] Suliman SMA. Pattern generating procedure for the cutting stock problem. Int J Prod Econ
               2001;74:293–301.
           [12] Mitchell JE. Branch and cut. In: Encyclopedia of operations research and management sci-
               ence. John Wiley & Sons, Inc.; 2011. p. 1–20. https://doi.org/10.1002/9780470400531.
               eorms0117.
           [13] Haessler RW, Sweeney PE. Cutting stock problems and solution procedures. Eur J Oper
               Res 1991;54:141–50.
           [14] Vanderbeck F. Decomposition in integer programming on Dantzig-Wolfe in a branch-and-
               price branching and ways to perform algorithm. Oper Res 2000;48(1):111–28. https://doi.
               org/10.1287/opre.48.1.111.12453.
   92   93   94   95   96   97   98   99   100   101   102