Page 47 - APPLIED PROCESS DESIGN FOR CHEMICAL AND PETROCHEMICAL PLANTS, Volume 1, 3rd Edition
P. 47

34                        Applied Process Design for Chemical and Petrochemical Plants

                                               GENERAL SERVICES AND UTILITIES CHECK  LIST
                       NOTE:  ONE COPY OF  THIS  LIST  TO BE  GIVEN TO SERVICE  AND  UTILITY SECTION
                       JOB  NO.                                       PREPARED BY:
                       CHG.  NO.                                      DATE:

                       JOB TITLE:
                                                                      LOCATION:








                        ELECTRICAL 440  V                       *KVA
                                                             -
                        MISC.  LIGHTING,  ST.  ETC.,             UVA
                        <I10 V)
                        WELL  WATER (CITY)                       GPM
                        SEA  WATER                             1  GPM
                        RIVER  WATER - PROCESS                   GPM
                        RIVER WATER-FIRE  PROT.                I   GPM          I


                                          I                  -bFM .__ I
                        COMPRESSED AIR                          -             -
                                          I


                       .-
                       ---   30  PSlG                           LB/HR
                       _-_.-__ -----                            LB/HR
                        CONDENSATE  RETURN
                        CONDENSATE USAGE                        LB/HR
                        PROCESS  TRANSFER  b
                        RAW MATERIALS
                                                                 -
                       ,c?.,usflf.!-%,     -_ -.         -      LB/HR   .
                        BRINE (-90)-                            LB/HR
                        L PO                                    LBlHR
                                          I.                   I     I          I
                          .--
                                          I                    I     I          I






                        .- -..
                       -----                                     GPM
                        WASTE  WATER



                       .-- ---.----       I
                        *ASSUME  1  HORSEPOWER = I  KVA
                                               Figure 1-31. General services and utilities checklist.



              small diameter (less than 8 feet) vessels operating in a def-   For the larger diameter storage vessels operating with a
              inite  pressure  system.  Thus,  the  effect  of  a  reasonable   few ounces water to 1 psig, the selection of  a design pres-
              overpressure for design  (as suggested by Figure 1-33) on   sure must also consider the system surges in  relation  to
              the vessel wall thickness is usually negligible.      the  normal  conditions.  For  example,  a  storage  tank  20