Page 103 - Boiler Operator’s Handbook
P. 103

88                                                                                Boiler Operator’s Handbook


               tom blowoff valves are not there to regulate the water  formation in those tubes to promote subsequent failure.
               level; if the water continuously runs high then get the  Water tube boilers are very susceptible to that form of
               level controls fixed. The bottom blowoff valves are not  damage. There should be written procedures in any
               there to lower the concentration of solids in the boiler  plant for performing a bottom blow and they should be
               water, that’s what the continuous blowdown system  complied with.
               is for. Continuous blowdown removes water with the       Since the purpose of a bottom blow is to remove
               highest concentration of solids and, when diverted to  solids from that mud drum you want to have enough
               a blowdown heat recovery system, waste very little en-  water flowing out to flush it well so the first step in pre-
               ergy.                                                paring for a bottom blowoff is to either temporarily raise
                    They are definitely not for maintaining boiler oper-  the drum level controller setpoint, use manual control,
               ation; I had a hard time believing an operator was blow-  or bypass the feedwater valve to raise the boiler water
               ing his boiler down every fifteen minutes so enough  level up to within a couple of inches of the top of the
               cold water was added to prevent the boiler cycling off;  glass. That provides the maximum reservoir of water for
               he was wasting fuel, water, and his own energy to keep  a good flush of the mud drum.
               the boiler from doing something normal. Operating        Open the first valve (more later on which valve
               the bottom blowoff valves without concern for operat-  gets opened first) then crack (see valve manipulation)
               ing conditions can interrupt boiler water circulation to  the second valve to allow some water to slowly drain
               result in an eventual failure. Use them only for their  out of the boiler and heat up the blowoff piping and
               intended purpose.                                    flash tank or blowoff tank. When the level in the gauge
                    The first and principal consideration for a bottom  glass has dropped an inch, open the valve completely
               blow is to make certain you are in control of it. I prefer  to provide full flow to flush the mud out of the boiler.
               they be done at the change of shift so two operators  Then, when the level is about two inches from the bot-
               are there to do it. You can do it yourself if, and only if,  tom of the glass close the valves. Restore the setpoint or
               you can see the gauge glass while you’re operating the  automatic control to establish normal water level.
               valves. There are very few boilers set up so you can do     Continue to monitor the level until it returns to
               that and it’s still a good thing to have another person on  normal and check it frequently for about an hour af-
               hand in case something goes wrong; I once had a blow-  terward. I like to blow down the water column a few
               off valve stick open.                                times at two minute intervals after the bottom blow; if
                    Whatever you do, don’t consider the blowoff  any mud was left in the boiler it was loosened and will
               an option to test the low water cutoff. I see that done  show as color in the fresh water in the gauge glass. If I
               regularly and ask the operator the question “What are  see some color then I know I have to blow down more
               you going to do the day the low water cutoff doesn’t  frequently; usually when that happens I knew it was
               work?” Oh, I get a lot of assuring answers but the only  coming because the water supply or some other factor
               right one is that operator will finally decide that some-  that would increase solids accumulation in the boiler
               thing’s wrong, close the blowoff valves and walk to the  had changed.
               front of the boiler to see the gauge glass empty and, as     As to which valves to operate first; forget the argu-
               in one case related to me, look into the furnace to see all  ments about the valve closest to the boiler, that’s seldom
               the tubes glowing red! If there’s no one there to keep an  the criteria. It depends on the valves. If the two valves
               eye on the gauge glass don’t blow the boiler down until  are identical Y pattern globe valves then the closest is
               someone is. Watch the glass every second until the entire  opened first and closed last so all the erosion is concen-
               process is complete.                                 trated on the valve furthest from the boiler; however,
                    A bottom blow removes a considerable amount of  such arrangements are unusual.
               water in a very short time and can change the natural     The most common mistake I see is associated with
               circulation in the boiler. Unless the manufacturer’s in-  the systems that have one slow opening valve and one
               structions specifically state that a bottom blowoff can be  quick opening valve. The operators tend to believe the
               performed below a certain load never perform a bottom  slow opening valve should be opened first and closed
               blow without shutting down the burners. Never blow a  last so you can give the boiler a real quick blow with that
               boiler with loads above the limit prescribed by the boiler  quick opening valve; after all, that’s why they put it on
               manufacturer either.                                 there, right? Nope, the quick opening valve is there be-
                    A bottom blow can temporarily stall flow in ris-  cause you can open it quickly without anything flowing.
               ers resulting in high concentration of solids and scale     With the slow opening valve you don’t produce