Page 498 - Boiler_Operators_Handbook,_Second_Edition
P. 498

Index                                                                                               483


               hot wire analyzers 415             installing packing 209             life cycle cost 278
               HRSGs 142, 362                     instantaneous hot water heaters 133  life of electrical equipment 215
               HRT boiler 281                     instructions 199                   lift test 78
               HTHW 271                           instrumentation 367,  422          light-off conditions 58
                  boiler control 390              instrument maintenance 210         light-off position 62
                  design conditions 129           Instrument Society of American 380  limit and operating controls 170
                  generator 129                   insulation inventory 206           limit switches 170
               humidifiers 187                    insulation studs 205                   boiler 303
               HVAC 179                           insurance companies 91             linear air flow 405
               hydraulics 16                      integral 374                       linearity 383
               Hydrazine 260                      intercoolers 354                   linkage adjustment 402
               hydrocarbons 24                    intermediate supported units 279   liquid line 167
               hydrogen 362                       intermittent duty motors 38        liquid observation port 167
                  as a fuel 229                   interruptible gas 32,  84          list of disasters 44
                  -carbon 235                     interstitial space 233             lithium bromide 176
                  heating 124                     in. W.C. 11                        little bits 205
               hydrostatic testing 94             ion 243                            live zero 367
               hyperbolic cooling towers 178                                         LNG 228
               hysteresis 375,  409               J                                  load 12
                                                  jacking gear 102,  360             load control valves 169
               I                                  jackshaft control 399              local boilers 31
               ice expands 152                    jet pumps 350                      local setpoint 366
               ice storage 152                                                       local transmitters 428
               ideal gas law 352                  K                                  lock-out, tag-out 200
               idle systems 80                    Ken Donithan of Total Boiler Control   locomotive boiler 282
               ignition arch 322                      200                            log book 45
               ignition cycle 63                  key caps 286                       log calculations 52
               ignition permissive 395            keyed in 208                       logs 45
               imbalance 348                      kiln dried wood 237                longitudinal welds 289
               impeller turned down 331           King Valve 168                     loop 366
               impending emergencies 75           know your plant 109                loop trap 103
               implied measures 12                kpph 10                            losing calibration 212
               implosion 288                                                         lower explosive limit 29
               impulse turbine 358                L                                  lower heating value (LHV) 115
               inches of water 10                 lack of a ground 35                low fire changeover 84
               incomplete combustion 25           landfill gas 230,  317             low fire hold 67,  407
               incomplete penetration 224         lantern ring 209                   low fire position 86
               individuals without a license 432  large hydronic heating systems 389     switches 62
               induced draft boiler 287           lawn sprinkler example 16          low fire start 398
               inert gas 25,  201                 law of conservation of mass 27     low hydrogen electrodes 224
               inferential metering 410           lay-up 96                          low load 105
               infrared thermometer 215           lead-lag controls 387              low oil pressure switches 170
               inlet bell 348                     leakage in a long duct run 194     low pressure boilers 271
               inlet conditions 182               leakage is necessary 327           low pressure drop check valve 304
               inlet screens 348                  leak testing of fuel oil safety shut-off   low-pressure heat exchangers 24
               inlet vanes 158                        valves 78                      low-pressure switch 170
               input-output efficiency 114        LEDs 212                           low set firebox boiler 282
               in-situ analyzers 416              Legionella 136                     low temperature switch 171
               inspection and access doors 185    LEL 29                             low water cutoff 300
               inspector’s gauge connection 91    levels 8                               fail 92
               instability 29                     licensed individuals 433           low water flow switches 129
   493   494   495   496   497   498   499   500   501   502   503