CHAPTER 3                           BRIDGE FAILURE STUDIES AND SAFETY ENGINEERING           111



        Table 3.13  History of bridge failures due to lack of maintenance or neglect (management issues) (continued).
        U.S. Bridges             Location            Year  Details of Failures
        Sergeant Aubrey Cosens VC   Latchford, Ontario,   2003  Corrosion of hangar pins supporting fl oor beams of long span
        Memorial Bridge          Canada                    bridge
        Shannon Hills Drive bridge  Shannon Hills, Arkansas  2004  Pedestrian bridge collapsed from the weight of crane—
                                                           overloading
        Sappa Creek bridge       Northwest of Norcatur,   2004  Overloading from heavy grain trucks over the bridge
                                 Kansas

        Laurel Mall pedestrian bridge   Laurel, MD   2005  Bridge was attached by metal bolts and brackets which had
        connecting parking and                             corroded
        shopping areas
        Lakeview Drive Bridge,   Washington County, PA  2005  Corrosive road salt draining onto side of a concrete girder
        Interstate 70                                      overpass

        Interstate 35W over      Minneapolis, Minnesota  2007  Lack of redundancy—structurally defi cient bridge not
        Mississippi River                                  maintained.
        Canadian Bridges

        Duplessis bridge, plate girder   Between Montreal and   1951  Brittle failure of new steel—sub-standard construction
        composite bridge, 2-span,   Quebec                 material. Lack of testing of materials—management error
        (St. Maurice River)
        Wood trestle bridge      Near McBride, British   2003  The bridge collapsed under a CN Rail freight train. Inspectors
                                 Columbia                  discovered severe rotting in the wood bridge in 1999—
                                                           problems with railway’s inspection and maintenance program

        British Bridges
        Suspension bridge        Near Bristol, England  1978  Unexpectedly heavy truck traffi c, hanger failures, construction
                                                           errors—overloading

        Ynys-y-Gwas Bridge       West Glamorgan, Whales  1985  Segmental construction with thin mortar joints, highly
                                                           permeable mortar at joints allowed moisture, chlorides and
                                                           oxygen ready access to tendons, corrosion of longitudinal
                                                           tendons at the segment joints—Deterioration

        Austrian Bridges
        Timber foot bridge       Near Zell am See,   1974  Rotten piers not detected during inspection —deterioration
                                 Pinzgau
        Reichsbrücke over Danube River Vienna        1976  Water enters pier and freezing-thawing cycles destroy
                                                           unreinforced pier, shear failure, lacking inspection and
                                                           maintenance
        Timber foot bridge       Vorarlberg          1976  Rotten piers, no inspection—deterioration
        Indian Bridges

        Damanganga River bridge  Daman               2003  Irregularity of the administration in repairs, should have been
                                                           replaced for 15 years

        Australian Bridges
        King Street Bridge over   Melbourne          1962   Brittle failure of new steel, lack of testing of materials
        Yarra River                                        —management error