Page 9 - Bridge and Highway Structure Rehabilitation and Repair
P. 9

viii                                                                                 CONTENTS



                             5.11  SOFTWARE FOR SUBSTRUCTURE - 233
                             BIBLIOGRAPHY - 234


                        Chapter 6  Applications of Bridge Design and Rating Methods                 237
                             6.1 INTRODUCTION - 237

                             6.2  LIMIT STATES DESIGN EQUATION - 237
                             6.3  LEGAL LOADS - 240

                             6.4  SIMPLIFIED FORMULA - 246
                             6.5  RATING PROCEDURES FOR CONCRETE AND STEEL BRIDGES - 255
                             6.6  RATING OF SECONDARY STRUCTURAL MEMBERS - 260

                             6.7  EXAMPLE OF LOAD RESISTANCE FACTOR RATING (LRFR) - 261
                             6.8  DESIGN OF A DECK SLAB - 266

                             6.9  RATING PROCEDURE FOR REINFORCED CONCRETE T-BEAM BRIDGE - 274
                             6.10  RATING OF PRESTRESSED CONCRETE GIRDER - 276

                             BIBLIOGRAPHY - 279

                        Chapter 7  Bridge Widening and Deck Replacement Strategy                    281

                             7.1  SELECTING BRIDGE WIDENING OR REPLACEMENT - 281
                             7.2 SUPERSTRUCTURE WIDENING - 284

                             7.3  REHABILITATION/RETROFIT OR REPLACEMENT DECISIONS - 285
                             7.4  REPLACEMENT PLANNING OR A NEW BRIDGE AT A DIFFERENT LOCATION - 295
                             7.5  CONSTRUCTABILITY ISSUES - 303

                             7.6  SUPERSTRUCTURE REPLACEMENT PROCESS - 308
                             7.7  CASE STUDIES OF ALTERNATES FOR REPLACEMENT OR NEW BRIDGES - 317

                             7.8  PRACTICAL CASE STUDIES - 318
                             7.9  SELECTED CASE STUDIES - 328

                             BIBLIOGRAPHY - 331



                        SECTION 3  REPAIR AND RETROFIT METHODS                                      133
                        Chapter 8  Inspection, Rating and Health Monitoring Techniques              335

                             8.1  BRIDGE MANAGEMENT SYSTEM (BMS) - 335

                             8.2  BRIDGE INSPECTION LEADING TO DIAGNOSTIC DESIGN - 344
                             8.3  TYPES OF INSPECTIONS - 349
   4   5   6   7   8   9   10   11   12   13   14