Page 12 - Construction Waterproofing Handbook
P. 12
x CONTENTS
Chapter 10. The Building Envelope: Putting It All Together 10.1
Introduction / 10.1
Envelope Waterproofing / 10.1
Transition Materials / 10.2
Flashings / 10.6
Flashing Installation / 10.7
Dampproofing / 10.9
Dampproofing Installation / 10.17
Sealant Joints / 10.17
Reglets / 10.22
Waterstops / 10.25
Other Transition Systems / 10.25
Drainage Review / 10.26
Envelope Review / 10.28
Verifying the Envelope Barrier / 10.36
Roofing Review / 10.43
1/90 Percent Principle / 10.45
Chapter 11. Life Cycles: Quality, Maintenance, and Warranties 11.1
Introduction / 11.1
Contractors / 11.1
Manufacturers / 11.9
Maintenance / 11.10
Warranties / 11.11
Types of Warranties / 11.12
Warranty Clauses / 11.13
Unacceptable Warranty Conditions / 11.14
Maximum Obligation Limit / 11.14
Limitation of Liability / 11.14
Prorated or Depreciable Value / 11.15
Access Provisions / 11.15
Escape Clauses / 11.16
Chapter 12. Envelope Testing 12.1
Introduction / 12.1
When Testing Is Required / 12.1
Testing Problems / 12.2
Standardized Testing / 12.2
ASTM / 12.3
Other Testing Agencies / 12.3
Mock-Up Testing / 12.4
Air Infiltration and Exfiltration Testing / 12.11
Static Pressure Water Testing / 12.12
Dynamic Pressure Water Testing / 12.13
Mock-Up Testing Summary / 12.14
Job-Site Testing / 12.15
Masonry Absorption Testing / 12.17
Sealant Joint Movement / 12.19
Manufacturer Testing / 12.20
Testing Deficiencies / 12.23
Chapter 13. Leak Investigation and Detection 13.1
Introduction / 13.1
Leakage Investigations / 13.1