Page 46 - Construction Waterproofing Handbook
P. 46

2.10   CHAPTER TWO

























                                    FIGURE 2.12 Drainage system being applied directly to founda-
                                    tion lagging. (Courtesy of TC Mira DRI)





























                         FIGURE 2.13 Installation of drainage field adjacent to foundation for completion of prefabricated
                         drainage system. (Courtesy of Webtech, Inc.)
   41   42   43   44   45   46   47   48   49   50   51