                 •Establish and maintain records of acceptable suppliers, contractors, and consultants.
                 •Purchasing data. Each manufacturer shall establish and maintain data that clearly describe or
                   reference the specified requirements, including quality requirements, for purchased or otherwise
                   received product and services. Purchasing documents shall include, where possible, an agree-
                   ment that the suppliers, contractors, and consultants agree to notify the manufacturer of changes
                   in the product or service so that manufacturers may determine whether the changes may affect
                   the quality of a finished device. Purchasing data shall be approved in accordance with 820.40.


              EXHIBIT 1-1B  21 CFR Part 820.50—Quality System Regulation.



                                                           Vendor
                                                           Possible
                Phase          Deliverable                 in Package  Comment
                Planning       Change control form
                Planning       Business requirements
                Planning       Compliance assessment report           May have position
                                                                      papers
                Planning       Validation plan             M          See below
                Requirements   User requirements           T          See below
                Requirements   User acceptance test plan/cases  T     Should be developed at
                                                                      this stage
                Requirements   Product functional specification  E    See below
                Configuration  Configuration specifications  T        See below
                Install/Test   Installation plan and qualification  T  Installation qualification
                                                                      expected
                Test           System/operational test protocol  E    If required
                               and report
                Test           System performance test     T          See below
                               protocol and report
                Test           Validation report           T          Possible, but not likely
                Use            User manual                 E          Manuals and SOP for
                                                                      system expected
                Use            Support plan/contract       E          If required
                Cross          Traceability matrix         M

                VENDOR DEVELOPMENT
                Planning       Quality/project plan                   These should be
                                                                      available for review as
                                                                      part of a vendor audit
                Requirements   Product requirements
                Design         Design specification
                Develop        Program standards