Section Four
PNEUMATIC
MECHANICAL
INSTRUMENTATION
This section is included to cover the complete man
hours required for installing pneumatic mechanical
instrumentation, as may be required for the monitor-
ing of various process systems.
The man hours listed are for labor only and do not
have any bearing on material or equipment cost.
All labor man hours are included for unloading,
from railroad cars or trucks, hauling to and unload-
ing at job storage facilities, hauling from storage to
erection site, calibrating when necessary, position-
ing in place, testing, and final check.