Page 181 - Estimators Piping Man Hour Manual
P. 181

Section            Four


                             PNEUMATIC

                             MECHANICAL

                             INSTRUMENTATION





                             This  section  is  included  to  cover  the  complete man
                             hours  required  for  installing  pneumatic  mechanical
                             instrumentation, as may be required for the  monitor-
                             ing of various process systems.

                             The  man hours  listed  are  for  labor  only and  do  not
                             have any bearing on material or equipment cost.

                             All  labor  man  hours  are  included  for  unloading,
                             from  railroad cars or trucks, hauling to and unload-
                             ing at job storage facilities,  hauling from storage to
                             erection  site,  calibrating  when necessary,  position-
                             ing in place,  testing, and final  check.






























                                        164