Page 366 - Forensic Structural Engineering Handbook
P. 366

(a)



























                                            (b)

























                                            (c)
                FIGURE 10.12  Bridge demolition. (a) Schematic elevation of North Girder. (b) Disassembly by
                crane on barge. (c) Girder collapsed when lifted for removal.

                                           10.53
   361   362   363   364   365   366   367   368   369   370   371