Page 85 - Forensic Structural Engineering Handbook
P. 85

Spec Section Revised Contract Sum Pending Changes Approved Changes Total Cost   $823,000.00 $9,850.00 $9,850.00 $813,150.00  04050  $122,500.00  $120.00  $0.00 $122,500.00  01100  $9,020,350.00 $29,904.00 $20,350.00 $9,000,000.00  01100  $858,600.00  $0.00  $0.00 $858,600.00  06100  $209,200.0




                      Description  Basic masonry   materials  methods  Summary  Summary  Rough carpentry  Basic finish   materials/  methods  Price/payment   procedures  Ceilings






                      Date  4/15/00  3/1/00  1/3/00  4/16/00  6/1/00  3/16/00  6/1/00





                  Contract Log  Contract Number  ACME General Contractors




                  TABLE 1.9  From  To   ACE Mason Contractors  ACMEGC AA450-00602  ACMEGC Direct Costs PHILASCH AA450-00012  BRINK Contractors  ACMEGC AA450-00300  BUTTON Paint & Paper  ACMEGC AA450-00400  CPM Consultants  ACMEGC AA450-00500  FINISH Ceilings  ACMEGC AA450-01300





                                       1.63
   80   81   82   83   84   85   86   87   88   89   90