Page 85 - Forensic Structural Engineering Handbook
P. 85
Spec Section Revised Contract Sum Pending Changes Approved Changes Total Cost $823,000.00 $9,850.00 $9,850.00 $813,150.00 04050 $122,500.00 $120.00 $0.00 $122,500.00 01100 $9,020,350.00 $29,904.00 $20,350.00 $9,000,000.00 01100 $858,600.00 $0.00 $0.00 $858,600.00 06100 $209,200.0
Description Basic masonry materials methods Summary Summary Rough carpentry Basic finish materials/ methods Price/payment procedures Ceilings
Date 4/15/00 3/1/00 1/3/00 4/16/00 6/1/00 3/16/00 6/1/00
Contract Log Contract Number ACME General Contractors
TABLE 1.9 From To ACE Mason Contractors ACMEGC AA450-00602 ACMEGC Direct Costs PHILASCH AA450-00012 BRINK Contractors ACMEGC AA450-00300 BUTTON Paint & Paper ACMEGC AA450-00400 CPM Consultants ACMEGC AA450-00500 FINISH Ceilings ACMEGC AA450-01300
1.63