Page 148 - Formulas and Calculations for Petroleum Engineering
P. 148

Drilling engineering formulas and calculations Chapter  2  141



             2.157 Number of sacks of cement required for a given length of plug

             Input(s)
                L p :  Plug Length (ft)
                                     3
                C c :  Casing Capacity (ft /ft)
                E:   Excess Volume (fraction)
                                  3
                Y:   Slurry Yield (ft /stroke)

             Output(s)

                N s :  Sacks of Cement Required (unitless)


             Formula(s)

                                                            L   C   E
                                                                 c
                                                             p
                                                        N ¼
                                                         s
                                                               Y
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
             Gulf Professional Publishing, Page: 61.


             2.158 Number of sacks of lead cement required for annulus
             Input(s)

                L c :  Feet to be Cemented (ft)
                                      3
                C a :  Annular Capacity (ft /ft)
                E:   Excess Volume (fraction)
                                               3
                Y:   Slurry Yield of Lead Cement (ft /stroke)

             Output(s)

                N s :  Sacks Required (unitless)


             Formula(s)

                                                            L   C   E
                                                                 a
                                                             c
                                                        N ¼
                                                         s
                                                               Y
             Reference: Lapeyrouse, N. J., 2002, Formulas and Calculations for Drilling, Production and Workover, Second Edition,
             Gulf Professional Publishing, Page: 54.


             2.159 Number of sacks of tail cement required for casing
             Input(s)

                L c :  Distance between Float Collar and Shoe (ft)
                                     3
                C c :  Casing Capacity (ft /ft)
                                               3
                Y:   Slurry Yield of Tail Cement (ft /stroke)

             Output(s)
                N s :  Sacks Required by Casing (unitless)
   143   144   145   146   147   148   149   150   151   152   153