Page 88 - Highway Engineering Handbook Building and Rehabilitating the Infrastructure
P. 88

FIGURE 2.1  Example of map used in study of alternate routes showing four possible corridors.
                               Conversions: 5 mi   8 km, 2000 ft   610 m. (From Justification Study for Crossroad Grade
                               Separations, US 30, by Balke Engineers for Ohio Department of Transportation, with permission)

                                                             71
   83   84   85   86   87   88   89   90   91   92   93