Production Operations and Maintenance                                 315


                       gas lift gas
                                                                  export gas

                                                      gas-liquid
                                gas lift gas          separator   (CAO monitored)
                               distribution
                             (CAO controlled)                     export liquids











                                                           production
                                                           manifold
                                                           (CAO monitored)


                                                                         gas

                                                                test
                                                                         (CAO monitored)
                      wells                                   separator

                                                                         liquid
             Figure 12.2  Use of CAO in gas-lift optimisation.
             producing GOR (using the test separator) provides a CAO system with the
             information to calculate the optimum gas-lift gas required by each well, and then
             distributes the available gas-lift gas (a limited resource) between the producing wells.
                Testing of the production rate of each well on a routine basis can be performed at
             the drilling platform or at the centralised production facility (Figure 12.3). Consider
             an offshore development with four eight-well drilling platforms and one centralised
             production platform. If the production from each drilling platform is manifolded
             together for transfer to the production platform then the there are two principal
             ways of testing the production from each well on a routine basis (required for
             reservoir management described in Section 16.1, Chapter 16):

             1. A test separator is provided on each drilling platform and is used to test the wells
                sequentially. The capacity of the test separator would have to be equal to the
                production from the highest rate well.
             2. A test separator is provided on the production platform, and is large enough to
                handle the production from any one of the drilling platforms. An individual well
                would be tested by passing the production from its drilling platform through the
                test separator and then shutting in the well under consideration and calculating its
                production from the reduction in rate. This is referred to as ‘testing by difference’.