Page 442 - Hydrocarbon Exploration and Production Second Edition
P. 442

TERMS AND ABBREVIATIONS





             AHBDF                     alonghole depth below derrick floor
             AI                        acoustic impedance
             ALARP                     as low as reasonably practicable
             API                       American Petroleum Institute
             AVA                       amplitude variation with angle
             AVO                       amplitude variation with offset
             BHA                       bottom hole assembly
             BOP                       blowout preventor
             BS&W                      base sediment and water
             BYC                       base year cost
             CAO                       computer-assisted operations
             CAPEX                     capital expenditure
             CD                        chart datum
             CFC                       chlorofluorocarbon
             CMP                       common midpoint
                                       carbon dioxide
             CO 2
             CPA                       critical path analysis
             CPI                       corrugated plate interceptor
             CRA                       corrosion resistant alloy
             CSEM                      controlled source electro-magnetic
             CT                        computerised tomography
             CTD                       coiled tubing drilling
             DC                        drill collar
             DCD                       declaration of commercial discovery
             DCQ                       daily contract quantity
             DHSV                      downhole safety value
             DP                        dynamic positioning
             DST                       drill stem test
             DSV                       diver support vessel
             EIA                       environmental impact assessment
             EM                        electro-magnetic
             EMV                       expected monetary value
             EOR                       enhanced oil recovery
             ERD                       extended reach drilling
             ESDV                      emergency shutdown valve
             ESP                       electrical submersible pumps
             FDP                       field development plan
             FEED                      front end engineering design
             FEWD                      formation evaluation while drilling



                                                                                   429
   437   438   439   440   441   442   443   444   445   446   447