                          Step 4: Design Conditions
                          Suggest and agree with customer on the outdoor conditions within which
                      the target levels have to be met, e.g., absolute maximum temperature versus
                      95% temperature.

                          Step 5: Reliability
                          • Study the reliability requirements of the process with the customer.
                          • Define and get the customer's acceptance of the needs for
                            ventilation system reliability, e.g., what is the allowed break-off
                            time.
                          The tools for this task include:
                          • Laws, regulations
                          • Standards
                          • Guidelines, codes of practice