Page 64 - Intelligent Digital Oil And Gas Fields
P. 64

using
                                wells
                                     oil
                              a
                                   increase
                         water
                     per
                              in
                   pro-
                                       just
                                     overall
                            30%
                       by
                              water
               Economics
                                         actions/well
                                60
                     8%
                                       in
                         the
                   oil
                       well,
                            by
                                of
                                   an
                                       production
                     by
                         increasing
                                     in
                   Improved
                              of
                                area
                                   Realized
                            injection
                     duction
                       per
                              MSTB
                                     37%
               Notional
                                total
                       day
                                         10
                                     of
                                   •
                   •
                   Digital
                                       gas
                                well
                                     manage-
                     Program
                                         optimization,
                                   and
                                       reporting,
                              well
                       than
                         workflows.
                                performance,
                   12
                                   surveillance,
                              workflows:
                       more
               Practices
                            Technical
                   of
                                     test
                     Oilfield
                   total
                                       ment,
                       with
                                     well
                                         lift
                         10
                   A
               Best
                            •
                   •
               DOF Best Practices
                       center
                   Collaboration
                     decision-
                                drives
                            meters
                         Multiphase
                              Variable-
                                   ESPs
                       support
                                speed
                            flow
                     and
                                   on
           Company,  Field  Gas  and  Sabriyah  Burgan,  Lower  Fields:  (2010)  KwIDF  and  Results Operational  Workflow Automated  Introduction to Digital Oil and Gas Field Systems actions. proactive optimization  ESP  effi-  team Increased  • Semipredictive  •  reducing  by  ciency  detect  to workflows  a  analyze  to  time  the encroach
                              •
                   •
                         •
           Oil  Components  well-  real-time  sys-  and  and  flow  test  electric  pumps  pressure  wells  data-  technical  workflows  and
           Kuwait  and  (DH)  with  RTU  Wi-max,  panels  with  meters  well  for  only.  Variable-speed  on  temperature  ESP  for  Collaboration  center
           Project:  Production  Solutions  Wellhead  downhole  wellbore.  Instrumented  head  sensors,  tem,  solar  Wellhead  Coriolis  multiphase  meters  wells  drives  submersible  (ESP)  Downhole  and  gauges  Operational  and  base  management  In-house  software  control
           for  and      •           •          •         •     •      •    •
           Benchmarks  Operations  to  Applied  Production  and  reservoir  focused  workflows
           Industry         to
           DOF  or  pro-  uptime  the  break-  due  injection  proac-  produc-  abnormalities
           1.8  Vision  Improve  duction  Manage  water  through  water  Detect  tively  tion
           Table  DOF  Goals  •  •  •
   59   60   61   62   63   64   65   66   67   68   69