Page 340 - Introduction to Petroleum Engineering
P. 340
INDEX 331
k‐value, 209, 210, 225, 296–299, 311 matrix, 29, 30, 42, 43, 113, 124, 131, 132,
kelly, 142, 143, 146–148, 168, 169, 183, 219, 281
kelly bushing (KB), 141–143, 176 McGuire, V.J., 197–198, 203–204
kick, 16 measurement while drilling (MWD), 146,
kickoff point (KOP), 156, 158–159 157, 176
kill line, 148–149 metamorphic, 107, 112
Klinkenberg, 30 microbial, 8
midstream, 205, 291, 293, 301, 306
laboratory measurements, 234 minimum miscibility pressure (MMP), 280
lag time, 175 miscibility, 7, 8, 278, 280
laminar‐intertial‐turbulent (LIT), 244–246 miscible, 278, 280
lateral resolution, 127 mobility, defined, 90
life cycle, 6 mobility ratio, 90, 91, 99, 278
limestone, 72, 113, 151, 183, 284 mole fraction, 53, 55, 64, 99, 208–211, 298
liner, 188, 189, 201 molecular weight, 5, 8, 31, 53, 61, 66, 99,
lithology log, 164, 175 279, 296, 299, 301, 310
lithosphere, 102, 103 Molikpaq, 307–309
live oil, 59, 60, 62 momentum, 213
log(s) monkey board, 141
acoustic, 167–169, 182, 183 Monte Carlo, 254, 256, 267
borehole imaging, 164, 174–175 mud
correlation, 178–179 cake, 148, 163
cross‐plot, 178 density, 147, 158
cutoff, 177–178 volume, 148
density, 43, 167–168, 178–179, 183 weight, 146, 148, 151
dipmeter, 174–175, 177 multilateral well, 157, 158
gamma‐ray, 164–165, 174, 176, 179, 182
legacy, 177 net present value (NPV), 12, 13
lithology, 164, 175 neutron, 153, 167, 169, 170, 179
mud, 151–152, 175 neutron log, 167, 169, 170, 179
neutron, 167, 169–170, 179 nonlinear, 238
photoelectric, 164, 167 normal distribution, 27, 28, 276, 289
porosity, 166–167, 171, 179 NPV see net present value (NPV)
resistivity, 166, 170–171, 173–174,
180, 182–183 objective function, 254
spontaneous potential, 164, 165, 180 objectives, 9, 161, 220, 271, 288
suite, 182 offshore platforms, 207, 221, 225, 250
logging oil productive capacity, 129
environment, 161, 162 oil‐water, 80, 84–86, 91, 97–99, 124, 180,
while drilling (LWD), 157, 176 182, 257, 258, 279
longitudinal stress, 211 open‐hole logging, 149, 152, 153, 176, 185
operating expenses (OPEX), 9, 12, 21
Macleod–Sugden, 99, 198, 204 overbalanced, 148
mapping, 109, 250 overburden, 73, 133, 159, 194, 196
mast, 141
material Pangaea, 104
balance, 63, 241, 249, 256–258, 260–262, parachor, 99
265–267, 269, 271 PBU, 232–234, 237, 240, 247
balance equation, 257, 258, 260–262, PDC bit, 145
265, 266, 269 peak oil, 23, 36, 37, 44