Page 86 - Open-Hole Log Analysis and Formation Evaluation
P. 86
Ay
be
are
Do
not
stay
there
‘during
FIGURE
and/or
jungles
Good
too
5.1
there
operations
Offshore
WU AAU
basically
filled
designed
and
will
UP
logging
to
the
disassembled
do
with
suspended
do
not be deterred.
units are
mechanical
leave
so,
same.
what
the
under
this
you
GALTULKUNG
operations.
ammonia
traveling block from which the
long without moving,
An
deck of the drilling barge, vessel,
into many small
Setup for a Logging Job.
keeps
logging
must.
top
maintenance
fumes
the
helicopters.
tool
is
FURKMALLON
engine
from
sheave
Courtesy
an
or platform.
that
it may become
dangling
required
Ifyou have good reason to be
in
to
ozalid
stops
Nevertheless,
stuck.
merely curious
EVALUALION
the
all
in the
Schlumberger
components and flown
avoid
DATA
well.
during
mounted on skids and bolted (or welded)
onlooker
If it
logging
Some logging units
In that case,
Well Services.
the
problems
is suspended can be raised
stays
logging
units
logging unit,
into remote
can
to the
copier. Although
away.
/3
>.
TO.
tries,
FIGURE
FIGURE
TOP
FIGURE
SHEAVE
CONTROL
Inc.
RECORDER
COMPUTER
5.2
5.3
5.4
WIRELINE
Top
PANELS
ANCHOR
LOWER
Details
CHAIN
DEVICE
— TENSION
-—= TOP
TIEDOWN
of
Sheave
LOGGING
POINT
CABLE
SHEAVE
ELEVATORS
SHEAVE
Lower Sheave
LOGGING
t
TO
Wireline
CABLE
OO
v ‘
,
TRUCK
See
OPERA LIONS
DEPTH
WINCH
Logging
a
WINCH
WIRELINE
MEASUREMENT
Setup.
Tiedown Arrangement.
and Elevator Arrangement for a
Courtesy
Gearhart
Logging Job.
Indus-