Page 97 - Open-Hole Log Analysis and Formation Evaluation
P. 97
:
_
_-
is
L
in
to
In
ity
are
not
Use
Use
sive
a
than
well.
want
“little
wall.
have
from
been
no
above
tool
be
Types
«.$til be
hole
nothing
logging
because
Logging
of a
Keeping
accurate
the
Removal
down-by
reservoir
although
operated
The
hole with
lithology,
device
In today’s
40°
on
utilization
Use
been
from
able
difficult
progressive
fixed
difficult
WIG LOOUS
logging
the
open-ended
Resistivity
logged
string
tool
this
hole
of
of
underreamed
and
specially
mud
vertical,
to
and
of logging
to
arms
tool
useful
arms
UF
differentiate
to
of Logs
tried
from
additional
to
diameter surface
limit
porosity
the
Hole Deviation
io
with
borehole
the
to
offshore
to
microfocused logs,
will
engineer,
oné
oil
can
that
the
fashion
exception.
the
tools
drillpipe.
make
devices
to
cannot
get
as
this
drilled
drillpipe
be
programs.
situations,
tool.
data.
the
open-hole
combinations
of centralizers
finder—a
be
vertical
evaluate,
the
The
from
open
computers.
obtained since the
push
If
such
the
circulation.
information
greater
with
GALHEKING
the
to
Be Run
bottom
and
as
contact
porosity
desired
a diameter of more
information
in
gas
two
a
the
dipmeters,
logging
corrections
hole
of
rubber
section
the
holes
causes
or
Holes
environment,
for
greater
hole
(chosen
to
with
measurements
technique.
and
than
about
as
tool will
the
Additional
slim
etc.)
are
determined
gauge.
needed)
size,
completion
borehole
tools
device.
guaranteed.
the
the
20
the
20
the
snout
with
medium-sized
specially adapted
more
induction
-may
relevant
,
rock
short
in.
FORMATION
but
formation.
to
gets
tools
on
from
in.,
“lean”
raw
Lo
wall
is
standoff pads
problems.
as
angle
logs
logging
difficulties
hole.-In
recorded
Where
hole,
be
evaluation
have
oe
are
the
safely to
the
according
A
deviated,
types
Running
sensor
of
engineer,
data
of
to
a
porosity
run
and
bigger.
on the
to
tool
of the
deviations
and
with
also
logs.
to
and
deviated hole
although
and
good
which
as
be
practically
possible’
evaluation
the
general,
EVALUATION
bottom
bottom;
generally consist
to
is
number
against
the
have spring-loaded,
such
the
this
become
risky because
pad
is the
devices
high
deviation
low side
of
has
hydrocarbon
there
physically
needed
laterologs
the
DATA
hole
so
type
wellbore.
physically
as
Logging
logged
of
of the
these
pad-contact
are
of one
limit
holes may thus cause a problem and require
is
completion
of.
provide
bottom
of
Theoretically,
a
of the
65°
the
contact
large
when
tool
of
suffer
getting
in
varies
in a
include:
large-
resistiv-
comprehen-
increased
the
geophysicist
hole
more
techniques
have
subsequently
limit
needed
borehole
logging
logging-
the
pumped
may
through
norm rather
a
a
a
mid,
the pad may
reservoirs
that
deviation
of the
there
hole;
hydraulically
85
5.
€
can
the
the
and
side
that
A
Also,
hole
Mud
All
The
zones
usually
choice
cutting
only be
list
that-the
through
formula
needed.
oil-based
designed
Borehole
provided
laterolog.
pretation
formation
of the
formation
of the way
type
references
that
the
of a
companies.
logged with
WIRELINE
erroneously
connate
information
or
of
for
INFLUENCE
spontaneous
can
Air-drilled
The
borehole
porosity
badly
laterolog
measurement
adversely
of the
the
hydrocarbons,
The practice
for
measurements.
an
sample
decision
high-water-loss
be’
OF
shallow
formations
for
conditions,
waters
contact
of
water
ar
and.
and
porosity
to
would
mud
shallow
extent
logged with
affect
borehole
mud
indicate
high-water-loss muds
in
resistivity
THE
formation beyond the
obtained
influences
both'the
devices
washed
LOGGING
and
in Appendix
potential
lithology
in
true
an
of
favor
programs
relating
drill
should
is
oil
can
the
on
result
logging
so
induction
values
the
5A,
holes, which
devices
oil-emulsion
out
the
tool.
in
the
be
MUD
in
the
radius
program
formations
going down the hole because
saturation
curve,
established.
otherwise
drilling
that
is
have
Mud
and
formations
recovery should
are
muds
device.
formation
invade.a
induction
tool
through
choice
cannot
water
can
previous
resistivity,
and
be
are
OPERATIONS
logging
friable formations drilled with
interpretation
can
controlled
formation.
of
It is possible for'a logging program
Thus,
calculated
of
operations,
can
highly rugose
protected
be
is normally based
obscure
induction
the
In
proper
by
they hang
no
a
recommended
PROGRAM
types
produce
of mudding up just before
wells.
designed.
the
obtain
the
resistivity,
up
when
from
water-bearing
log
the
shallow
the
for
natural
Likewise,
reduce
from
recovery
affect
holes
formation
efficient
prevent
program
of investigation
oil.
For
on
on the
invariably
is
nonconductive
mud
logging
so
and
to succeed
dictate
general,
mud
the
logging
the
on a
interest.
most
choice
constants
nomenclature
holes
adequately
of the
effective
Appendix
also
fluid
the
formation
and will
salty
ledges
enough
of
salinities
detection
fresh
for
a
or fail
excessive
reaching the
tool,
formations
resistivity
example,
5B
formatioris
to
Invasion.
filtrate
of
consulted
drilled
log. Where conductive
program
logging
deeply as
logging
or
log
give
type
between
microresistivity
of
water
operations.
drillstem
of the
high-water-loss
contact
to
fluid
the
muds
with
amplitude
help
in them,
various
of
later
filtrate
with
/
oil
function
fluids
tools
in
Nevertheless,
test
supplies
to
and
determined.
readings
with
invades
of
mud
reduce
especially
oil
muds favor
should
losses
are
devices.
situations
from
‘natural
find
resistivity device.
and/or bridges.
erroneous assumption
logs
and
‘from
from
erroneous
the
muds are
the
objective zone
the
inter-
mask the
evaluatioa
the
frorn
solely because
residual
be
the
Bi:
so
must be
can
and
induction
in
a
of the
cross
service
resistivity,
is
salty
the
devices