Page 42 - Petroleum and Gas Field Processing
P. 42

Figure 11 Open hole completion: (a) production through casing; (b) with tubing
            and packer.























            Figure 12  Cased hole completions: (a) without tubing; (b) with tubing packer.


            Tubing–Casing Configurations
            There are several different tubing–casing configurations. The selection of a
            particular configuration is normally governed by the characteristics of the
            reservoir and cost. The type of the reservoir and drive mechanism, the
            rock and fluid properties, and the need for artificial lift and improved
            recovery are among the technical factors which influence the selection of






 Copyright 2003 by Marcel Dekker, Inc. All Rights Reserved.
   37   38   39   40   41   42   43   44   45   46   47