Page 23 - Practical Well Planning and Drilling Manual
P. 23

Front Matternew.qxd  1/24/05  11:43 AM  Page xxiii






                                                                          [List of Acronyms]

                       Pe                   Photoelectric effect measurement
                       Pf                   Alkalinity of filtrate
                       PHPA                 Partially hydrolysed polyacrylamide
                       PI-SFL               Phasor Induction - Spherically Focused Log
                       pkr                  Packer
                       PM                   Alkalinity of mud
                       POB                  People on board
                       POOH                 Pull out of hole
                       ppg                  Pounds per gallon
                       PPM                  Parts per million
                       psi                  Pounds per square inch
                       psia                 Pounds per square inch (absolute)
                       psig                 Pounds per square inch (gauge)
                       PTD                  Proposed total depth
                       PU                   Pick up
                       PV                   Plastic viscosity
                       Rt                   True formation resistivity.
                       RAB                  Resistivity At the Bit
                       RFT                  Repeat Formation Tester
                       RIH                  Run in hole
                       RKB                  Rotary kelly bushing
                       RM                   Ream
                       RST                  Reservoir Saturation Tool
                       RU/RD                Rig up/rig down
                       SFJ                  Super flush joint
                       SHRDT                Stratigraphic High Resolution Dipmeter Tool
                       SITP                 Shut-in tubing pressure
                       sk/sx                Sack/sacks
                       SLM                  Steel line measurement
                       SO                   Slack off weight
                       sow                  Slip-on weld
                       SP                   Spontaneous potential
                       SPM                  Strokes per minute
                       sssv                 Subsurface safety valve
                       sscsv                Subsurface control safety valve
                       St                   Stand
                       TA                   Temporarily abandoned
                       TCT                  True crystallization temperature
                       TD                   Total depth
                       TDT                  Thermal Decay Time log
                       TFNB                 Trip for new bit



                                                    xxiii
   18   19   20   21   22   23   24   25   26   27   28