Section 3 revised 11/00/bc  1/17/01  12:00 PM  Page 354








                      [     ]   Practical Wellsite Operations
                       3.3.1



                           To get free, try to establish circulation while working the string
                       down and applying torque. If off bottom, a surface jar may help to get
                       movement and circulation. Once circulation is established, pump as
                       fast as possible without inducing losses and try to clean up the well.
                       Keep the string moving. On a floating rig, use the riser boost pump to
                       help lift the debris to surface.
                           Geopressured formation. In shales where the formation pore pres-
                       sure is greater than the mud hydrostatic, slivers of formation will tend
                       to be pushed into the wellbore. Use higher mud weight, if possible, to
                       reduce or eliminate this and keep the hole clean, using pills if necessary.
                           Where the formation is left exposed for a long time, very large
                       washouts can occur that may lead to other problems with large
                       chunks of formation falling in, big cuttings beds forming, fish becom-
                       ing impossible to recover (if they fall over in the washout,) and bad
                       cement jobs. If the formation cannot be controlled with mud weight,
                       then ensure that the casing can be run within a short time of drilling
                       the formation.
                           It may also be possible to displace cement into the washouts and
                       drill through it, leaving the cement to stabilize the formations. Adding
                       fibers to the cement may be prudent to reduce the possibility of cement
                       blocks. Also, fiberglass pipe can be run as if it were casing, placing
                       cement in the washout and allowing a “pilot hole” through the cement
                       for drilling out.
                           In the case of pipe sticking due to geopressured formation collapse,
                       the method of recovery is discussed in Section 3.3.1, “Cuttings beds.”
                           Fractured and faulted formations. Some formations are already
                       naturally fractured before being drilled into. This can again cause large
                       chunks of rock to enter the wellbore causing mechanical sticking.
                       Since the damage is already done, avoid making it worse by minimiz-
                       ing swab/surge pressures and drillstring vibrations, drilling at low
                       angle if possible, getting through it quickly, and casing it off.
                           Circulation may well be possible if mechanically stuck with large
                       pieces of formation above the BHA. Maintain circulation and
                       work/bump the pipe down until free. Start with light bumps because
                       shock waves from the string may cause further bits of formation to
                       come loose. When the string can be moved down, keep the string mov-
                       ing and circulate clean. It may be necessary to backream up to pass the
                       obstruction. Ream carefully when running back in.