Section 3 revised 11/00/bc  1/17/01  12:00 PM  Page 364








                      [     ]   Practical Wellsite Operations
                       3.3.3



                       should drop when pumping ceases to the level supported by the for-
                       mation fluid pressure, and the cement that has moved up the annulus
                       will probably drop down back to the loss zone.



                       3.3.3.  Washout Detection Procedure

                           A washout occurs when a hole appears in the drillstring. This
                       may come from erosion, a damaged tool joint face, or a crack in the
                       string. If left uncontrolled a washout can quickly become a drillstring
                       failure because most drilling fluids are fairly abrasive and will soon
                       cut metal away under high pressure. An otherwise avoidable fishing
                       job will result.
                           Washouts can be prevented by regular inspection of the drillstring
                       components, ensuring correct handling and torquing up of the drill-
                       string and avoiding excess fatigue stresses (see Section 1.5.2, “Dogleg
                       Severity Limits—Combined Buildup and Turn”).
                           A washout may be suspected when a steady drop in circulating
                       pressure is seen with steady pump rates, no change in mud properties,
                       and no other apparent symptoms. This can usually be seen by looking
                       at the geolograph chart recorder. Determining that a washout has
                       occurred is a process of elimination.

                       1. Eliminate a formation fluid influx. Reducing surface pressure
                           could be caused by a kick. Flowcheck before doing anything else.
                           If that is OK, then:
                       2. Eliminate a leak in the high-pressure rig system or a change in
                           mud properties. Close the lower kelly cock and pressure test the
                           system from the pumps to the kelly cock. With pressure on, com-
                           pare the gauge readings on the driller’s console, standpipe mani-
                           fold, and choke panel to ensure that a gauge problem has not
                           caused the alarm. While that is happening, check that no fresh
                           mud, water, or chemicals were added to the system giving a change
                           in mud rheology. If that is OK, then:
                       3. Eliminate a drop in pump efficiency. Take pressures with each
                           pump at the same slow circulating rate that was last taken (usual-
                           ly at the beginning of the tour or when the bit got to the bottom).
                           If one pump shows lower pressure than before, check out the fluid


                                                     364