Page 43 - Practical Well Planning and Drilling Manual
P. 43

Section 1 revised 11/00/bc  1/17/01  2:55 PM  Page 19








                                                              Well Design: General  [    ]
                                                                                    1.2


                           Check that the supporting infrastructure (roads, airfields, support
                           bases, etc.) is in place and fit for purpose; flag up if infrastructure
                           needs upgrading.
                           Define the earliest possible start date (logistics, permits/approvals,

                           rig availability, weather, AFE, infrastructure, etc.).























































                                                      19
   38   39   40   41   42   43   44   45   46   47   48