Page 456 - Practical Well Planning and Drilling Manual
P. 456
Section 3 revised 11/00/bc 1/17/01 12:00 PM Page 432
[ ] Practical Wellsite Operations
3.8.1
9. General
a) Communications and computers.
b) Anything else not covered above.
c) Conclusions and recommendations.
10. Appendices
a) Any special reports, e.g., well control problems, prognosed vs.
actual lithology, bit record.
b) Casing and cementing reports.
c) Formation integrity test reports.
d) BHA details.
e) Directional surveys and well plots.
f) Printoff showing pore pressures, fracture gradients, mud den-
sities, and overburden gradient against depth (e.g., Sperry Sun
PPFG printout).
g) Principal mud properties against depth.
h) Hole section summaries showing performance on this well
compared to offsets, if relevant.
i) Other reference information. Personnel involved in planning
and executing the well, for future reference.
j) A copy of the drilling program.
k) A copy of the technical justification.
432