Page 477 - Practical Well Planning and Drilling Manual
P. 477
Appendix NEW! revised 11/00/bc 1/30/01 3:29 PM Page 453
Appendix 4
Drilling Equipment Lists by Operation [ ]
30 in Conductor (Subsea Wellhead)
Item Qty Description
1 1 jt 30 in x 1 in WT X52 conductor shoe joint
2 10 jts 30 in x 1 in WT X 52 conductor pipe
3 2 jts 30 in crossover joint c/w ST-2 x Rl-4
4 1 30 in wellhead housing and extension c/w st2 conns
5 1 30 in cam actuated wellhead running tool
6 1 Temporary guide base
7 2 Slope indicators
8 1 30 in x 150t side door elevator
9 1 set 30 in bowl and slips
10 1 set 30 in single joint elevators
11 1 set 30 in safety clamp
12 1 Stab in sub NC50 box c/w redress kit
13 1 set 30 in bull tongs
14 1 Hilti gun c/w cartridges and spares or chisel/hammer
15 1 Circulating head c/w NC50 pin x 2 in Weco
16 1 lot Cement and additives
17 1 lot Dunnage
18 1 Centralizer for 5 in DP inside casing
20 in Casing (Subsea Wellhead)
Item Qty Description Comments
1 2 jts 20 in x 129.3# X56 casing c/w stab in float shoe, FL4S box up
2 70 jts 20 in x 129.3# X56 casing c/w FL4S connections
3 1 Stab in sub NC50 box c/w redress kit
4 2 pcs 18-3/4 in wellhead housing and extension c/w ALT-2 pin
5 2 pcs 20 in crossover joint ALT-2 x FL4S
6 2 pcs 18-3/4 in wellhead running tool
7 1 Hilti gun c/w cartridges and spares
8 A/R 20 in spring centralizers c/w stop collars and nails
9 2 20 in rigid centralizers c/w stop collars and nails
10 1 20 in wellhead running tool
11 1 set 20 in hand slips
12 1 20 in x 150t side door elevators
13 2 20 in 250t spider/elevator
14 1 set 20 in safety clamp
15 2 20 in single joint elevators
453