Page 546 - Practical Well Planning and Drilling Manual
P. 546

[      ]
                   Index


                  T                                 tour, 499
                  tangent section drilling          training programs, xv
                  directional planning, 177–178     transition zone
                     in vertical wells, 177–178        casing design and, 46
                     tank level monitoring systems, 316  pressure-depth graph of, 52
                  tapered casing string, 23         transverse drillstring vibration, rotary speed, 410
                  targets, directional design and, 119  triaxial stress analysis, 85–86
                  telescopic joint (TJ), 29         trip
                  temperature correction factors (TCF), 24  drill, 318
                  temperature log, electric logging/sampling, 282  making a, 486
                  temperature rating, slurry properties, 261–262  margin calculation, 314
                  temperature vs. crystallization point graph, of brines,   tripping practices, wellbore instability, 298
                     33                             true crystallization temperature (TCT), 32
                  10,000 psi WP classification, surface BOP stack con-  true vertical depth (TVD), 50, 53, 70, 75, 78, 108,
                     figurations, 327                  110
                  tension, 99, 100, 101, 102, 104, 105–106  tubing accessories, 23
                     from buoyant string weight, plus pressure,   tubing checking, for completion, 35
                        75–77                       tubular items, fishing operations for, 369–371, 371
                     formula for, 78                tungsten carbide insert (TCI) bits, 193
                     from overpull, 75              turbines, 199
                     safety factors and, 61–62         drill bits, 413
                     from shock loading, 77         turbulent flow, 500
                     steel temperature correction factors and, 64  good cement job factors, 266
                     from weight, in deviated wellbore, 73–74  turn rate, directional design and, 110–114
                  tertiary recovery techniques, 21  12 1/4 inch hole, drilling equipment, 451
                  thermal decay time log, 499       20 inch casing, drilling equipment, 453–454
                  thermal expansion, buckling force from, 83–84  26 inch hole, drilling equipment, 449
                  thickening time, slurry properties, 260  twist-off, 500
                  thinner, 499                      2000 psi WP classification, surface BOP stack con-
                  13 3/8 inch casing, drilling equipment, 454  figurations, 326
                  30 inch conductor, drilling equipment, 453
                  36 inch hole, drilling equipment, 448  U
                  thixotropic cement, slurry properties, 262–263  ultrasonic imager tool (USIT), 282, 500
                  thixotropy, 499                   undergage hole
                  3000 psi WP classification, surface BOP stack con-  from squeezing shales, 349–350
                     figurations, 326–327              stuck pipe, 302, 348–350
                  time dependent costs, drilling program, 138  underground blowout situation, barite plugs,
                  titration, 499                       377–378
                  tong                              under-ream, 500
                     back-up, 462                   universal bottom hole orientating (UBHO), 158
                     lead, 484                         sub, 165, 168, 175
                  tool joint, 499                       directional planning and, 163–164
                     damage, 111                    unreacted emulsifier, formation damage, 245
                  tooth wear, IADC 8 point grading scheme, 415  unsupported tubing, buckling in, 82
                  top hole                          updip drilling, 116
                     collapse, stuck pipe, 304, 353–354
                     lost circulation, 307–308      V
                  top of cement (TOC), 79, 82, 84, 262, 268, 269,   valency, 500
                     275                            van Oort, Eric, 293
                  top of fish (TOF), 368–369        variable bore rams (VBR), 151, 500
                  torque, 499                       velocity, critical, 500
                  torsional loads, calculation of, 84–85  vertical seismic profile, 500–501
                  total depth (TD), 21–22, 499      vertical wells
                  total flow area (TFA), 175, 189      directional planning and, 164–165
                  total force, in casing design, 67    tangent section drilling in, 177–178
                  Totco single shot survey tool, directional drilling, 428  viscometer, direct-indicating, 501
                  Totco surveys, directional planning and, 164–165


                                                  522






          INDEX.indd   522                                                        7/15/08   3:37:05 PM
   541   542   543   544   545   546   547   548