Page 10 - Principles of Applied Reservoir Simulation 2E
P. 10
Part III - Case Study
20 Study Objectives and Data Gathering 197
20.1 Study Objectives 197
20.2 Reservoir Structure 197
20.3 Production History 199
20.4 Drill Stem Test 201
20.5 Fluid Properties 203
20.6 Reservoir Management Constraints 207
Exercises 207
21 Model Initialization 208
21.1 Volumetrics 208
21.2 Material Balance 209
21.3 Relative Permeability 212
21.4 Fluid Contacts 214
21.5 Grid Preparation 215
Exercises 216
22 History Matching and Predictions , 218
22.1 Well Model Preparation 218
22.2 Full Field (3D) Model History Match 222
22.3 Predictions 223
Exercises 224
Part IV - WINB4D User's Manual
23 Introduction to WINB4D 229
23.1 Program Configuration 231
23.2 Input Data File - WTEMP.DAT 232
23.2 Data Input Requirements 233
23.4 Example Input Data Sets 234
24 Initialization Data 239
24.1 Grid Dimensions and Geometry 239
24.2 Seismic Velocity Parameters 245
24.3 Porosity, Permeability, and Transmissibility
Distributions 249
XI