Page 238 - Principles of Catalyst Development
P. 238

Part HI:  Case Stud  219



                                     0.00708 £



        where
           r e   =   drainage radius (ft)
                 =   wellbore radius (ft)
           r w
           S     =   skin

           K e   =   k roK abs ~ effective  permeability (md)
           ^««   =   net thickness (ft)
             Given S = -0.5, r w = 0.25 ft and
                                             2 /2
                         r o  -  0.14(Ax 2  + A^ )'  -  40ft

        with A* = A.y = 200 ft., we find
                            P/D  =  1.55  x  10- 3  K absh net

               ** r 0. Table 22- 1 presents the calculation of PID  for each layer identified
        where r e
        by well log analysis.

                                    Table 22-1
                             Estimate  of PID by Layer
                        Layer   K al* [md] h «m      PID
                                             n
                          1        75        72      8.4
                          2         0        20       0
                          3        250       64      24.8
                          4       250        32      12.4



        Oil Well FBHP Estimate
             The production well model needs a flowing bottomhole pressure (FBHP).
       Assuming  an oil column in the wellbore,  we can prepare  a quick estimate  of
        FBHP  for  a  single-phase  oil  well  that  is  completed  at  a  9500  ft  depth  by
       assuming FBHP  ~  oil head. Consequently, oil head is approximated by

                                  Y 0 Az  ~  FBHP
   233   234   235   236   237   238   239   240   241   242   243