Page 428 - Reciprocating Compressors Operation Maintenance
P. 428

Index  41 3


            path,  !66            delivery, incorrect, 318  reactive, 341
            piston ring, 21       divider block,  120-124  routine, 342
          LDPE (Low density       excessive,  120       valve, 131-167
             polyethylene), 54    feed adjustment, 257  Manual control, 195
          Length, acoustic, 100   feeder system,  120-124  Match-marked packing/ring,
          Life cycle costs, 352   film,  111-112          184, 191
          Lift                    foundation oil leaks, 249  Materials, 47-70
            control of,  141      full  pressure  circulation,  cylinder,  50-54
            high,  140,  i 45         110-111           foundation  bolt, 248
            limitation,  150      gases, chemically active,  126  liner, 54-56
            range of,  144        improper,  156, 251   piston rod,  61-70
            valve,  137,  149-150  inspection, 127-129  piston, 56-61
          Limitation, 5,  194     prelube,  185          valve, 146-148
          Liner, 54-56, 260       pressure,  317       Measurement, cylinder
            installation, 262-263  rate of,  113,  117    bore, 257
            interference fit, 262  safety, 374          locations,  257
            Ni-Resist, 56         sampling of, 361     Mechanical
            special,  262         shutdown,  129-131    action, abnormal,  152-154,
          Liquid, 28              splash,  108-109          156-158
            carryover,  151,  155  system, 114,122,  128  counter,  122
            films on discharge valve  synthetic, 126-127  efficiency, 10
               surfaces, 379      viscosities,  125     force-feed system,  114
            knockout, 212         wear,  182            interlock binding, 328
            piston compressor,  8                       scarification, 247
            slug,  151,155, 306  Machinery analyst, 304  Metal
          Load                  Magnaflux, 290,293      etch testing, 299
            crosshead pin, 89   Magnaglow, 290          locking, 301
            factor, 36, 37      Magnet, 328             spray,  264,  300
            frame,  10, 82, 86  Magnetic particle       stitching, 263-264,298,301
            reversal  at pin, 88    inspection, 299    Metallurgical upgrading,  155
            rod, graphic        Magnetism, residual, 328  Mill test reports,  355
               representation,  87  Maintenance, 127, 351  Misalignment, 230,243, 251
            tension, 84           bearing, 251-256     Moisture (see also
            unit loading of soil, 98  breakdown, 340,341, 342  Condensation),  34,113,
          Loading diagram,  crosshead  condition-based, 359  182,210,211,216
             pin, 88              contractors, 356-358  Molecular weight,  17
          Loading,  non-reversal,  64  corrective, 342  Moment,  93
          Lock nut, 165,366       cost, 220-223, 343,  Monitor/monitoring
          Log, daily, 217, 300        350-351           electronic,  I22
          Low density polyethylene  hints, 376          frame vibration, 364
             (LDPE), 54           improvement, 345      lamps, preloading,  237
          Lubrication/lubricator (see  levels of, 341-342  proximity probe,  244
             also Oil), 45,107-131  periodic  inspection, 359  rod piston, 368
            box,  114,  120,  121,  185  piston,  268-282  system, integrating
            consumption, excessive, 317  predictive,  340,342,347,  condition,  362-368
            cracked, 374              359-362           temperature,  362
            crankcase or bearing,  preventive, 340-368  vibration, 361
               108-i 11           program development,  valve cover temperature, 323
            cylinder and packing,     345-346          Motor controls,  326
               1 1 I I 1 6 ,  125-126  program objectives,  345  Multiple impacting, 156
   423   424   425   426   427   428   429   430   431   432   433