Page 107 - Reservoir Formation Damage
P. 107

90    Reservoir Formation Damage

                   u p=uK p/K                                               (5-50)


                   u np=uK np/K                                             (5-51)

                   Let  <|>  and  <j) K  denote  the  initial  pore  volume  fractions  of  the
                plugging  and  nonplugging  pathways  of  the  porous  media  (Civan,  1995)
                and  £ p  and  £ np  represent  the  fractions  of  the  bulk  volume  occupied  by
                the deposits in the respective pathways.  Thus,  the instantaneous  porosities
                in  the  plugging  and  nonplugging  pathways  are  given  by:


                         Po                                                (5-52)


                   $ np=$n Po-z np                                          (5-53)

                Total  instantaneous and  initial  porosities  are  given,  respectively,  by:

                   (b =  (b  +  (b                                         (5—54)


                   (|)  =  (j>  +  cj)                                     (5—55)

                The total  deposit  volume fraction  and the instantaneous available  porosity
                are  given  by:


                                                                            (5-56)
                   e = e p + z np
                   (J) =  (|> o  — e                                       (5—57)

                The  permeabilities  of  the  plugging  and  nonplugging pathways  are  given
                by  the following empirical  relationships by  Civan  (1994)  by generalizing
                the  expressions  given  by  Gruesbeck  and  Collins  (1982):


                   K  =                                                    (5-58)


                and


                                                                           (5-59)
   102   103   104   105   106   107   108   109   110   111   112