Page 124 - Solar Power in Building Design The Engineer's Complete Design Resource
P. 124

94   SOLAR POWER SYSTEM DESIGN CONSIDERATIONS


                11 Unit protection for polarity reversal
                12 Years of warranty by the manufacturer
                13 Reliability of technology
                14 Efficiency of the cell per unit surface
                15 Degradation rate during the expected life span (warranty period) of operation
                16 Longevity of the product
                17 Number of installations
                18 Project references and contacts
                19 Product manufacturer’s financial viability

                Inverter and automatic transfer system

                 1 Unit conversion efficiency
                 2 Waveform harmonic distortion
                 3 Protective relaying features (as referenced earlier)
                 4 Input and output protection features
                 5 Service and maintenance availability and cost
                 6 Output waveform and percent harmonic content
                 7 Unit synchronization feature with utility power
                 8 Longevity of the product
                 9 Number of installations in similar types of application
                10 Project references and contacts
                11 Product manufacturer’s financial viability
                  Note that solar power installation PV cells and inverters that are subject to the
                California Energy Commission’s rebate must be listed in the commission’s eligible list
                of equipment.

                Installation contractor qualification

                 1 Experience and technical qualifications
                 2 Years of experience in solar panel installation and maintenance
                 3 Familiarity with system components
                 4 Amount of experience with the particular system product
                 5 Labor pool and number of full-time employees
                 6 Troubleshooting experience
                 7 Financial viability
                 8 Shop location
                 9 Union affiliation
                10 Performance bond and liability insurance amount
                11 Previous litigation history
                12 Material, labor, overhead, and profit markups
                13 Payment schedule
                14 Installation warranty for labor and material
   119   120   121   122   123   124   125   126   127   128   129