Page 265 - TPM A Route to World-Class Performance
P. 265

Case studies  239

                   Norman’s suggestion, the vice was set down into the bench so that he can
                   slide, instead of  lift, the casting into it - an improvement costing €20 which
                   has had a sigruficant impact on health and safety by improving the ergonomics
                   of  the process.

                   PGM  core machine
                   The PGM core manufacturing machine moulds resin-enriched sand which is
                   then used in the casting process. Prior to TPM, there were chronic losses in
                   the precess, including unplanned downtime, quality and excessive waste.
                      A series of  more than twenty improvements have been made by the TPM
                   team to date, including:
                        Making  a bolt box, costing only €2, whch has led to an annual time
                        saving equivalent to €624
                      0  Replacement of  valves and gauges in the amine gas system
                        Clearing out the sand pit that had formed at the base of  the machine.
                        Prior to attention from the TPM team, aptly named  the Beach Boys,
                        sand was dowed to build up to waist height before being cleared. As
                        well as getting at the source of  sand spillage, any surplus sand is swept
                        away regularly and dropped tools no longer accumulate under the mound
                        of  sand
                      0  Installation of  a blow plate. An initial cost of  €50 represents an annual
                        cost saving of  f336

                    Team achievements
                        Total cost saving doubling the OEE
                      0  Average set-up time reduction of  30 minutes per event
                      0  88 per cent reduction in scrap
                      The machine will be moved to a location which incorporates bulk storage
                   of raw materials - a need highlighted by TPM activities. The project will also
                   address new environmental legslation concerning emissions of  the gas used
                   as a raw material.
                      The new set-up wiU  save hours in changeover times, due to the use of
                   quick-release fittings and supplier involvement in changeovers, as well as
                   dramatically reducing leaks.
                      Valued at €80 000, the project has received f30 000 funding from NSK - a
                   testament to its commitment to the work of  the Beach Boys team.

                   Quotable quotes

                          The key to TPM is making it easy to do things right and difficult
                          to do things wrong.
                                             John Smith, Team Leader, Machine Shop