20  TPM-A  Route to World-Class Performance


            (a)  either produce the same in less time
            (b) or  produce more in the same time
            The challenge for management is the need for clear strategies  - in case (a)
         to secure a future with a smaller operation without slipping below critical
         mass, in case (b) to ensure larger market share or grow the existing one. The
         rational choice will almost always be (b), as this has the greatest potential to
         improve shareholder value and reduce unit costs. Taking on the entrepreneurial
         role is the real management challenge (see Figure 2.3).


                                           Milestone 2
                          Milestone  1     Refine best   Milestone 3   Milestone 4
                       Introduction, trial and   practice
                         prove the route   I and standardize I  capability
            Capability
                                                               Achieve spark to
                         everyone involved                       start vision
                                                              Time 3 years plus




           Input
           Effort
           Ownership
           Responsibility


         Figure 2.3 Developing capability


         2.3  The potential to transform company
               performance

         TPM provides a route to support either strategy by delivering:
              organizational activity which reflects the future needs of  the changing
              customer /economic environment;
              an infrastructure to support team-based ways of working (management
              and shopfloor);
              decision processes based on systematic thinking to challenge accepted
              practices;
              team-based recognition and rewards  systems which align short-term
              activities with long term-business goals;
              a focus on enhancing knowledge rather than defending your corner;
              improved OEE to enhance supplier/customer  relationships;
              a mechanism to pull through improvements rather than pushing down
              initiatives;