After RPN                              SEV * OCC * DET

                                                         After DET                              A rating of 1 to 10 from Table 6

                                                         After OCC                              A rating of 1 to 10 from Table 6

                                                         After SEV                              A rating of 1 to 10 from Table

                                            Actions   Taken      What   actually   done to   reduce   RPN?
                                                                   was      the


                                            Responsibility   and  Due Date  for the action?  be complete?
                                                                 Who is   responsible   When is the   expected to
                                                                          action

                                                                 What actions,

                                                                   if any, should
                                                                     be taken to

                                            Recommended    Detection (DET)  TEAMFLY reduce the
                                               Action                     RPN?


                        Table 7. FMEA Information      General Information   RPN                SEV * OCC * DET      104

                                                                                                A rating of 1 to 10 from Table 6

                                                             Occurrence (OCC)                   A rating of 1 to 10 from Table 6

                                                           Severity (SEV)                       A rating of 1 to 10 from Table 6

                                            Current   Controls     systems   place to   prevent   cause or   failure?
                                                                 What   are in   the   detect   the


                                            Potential   Causes   What   might   cause   failure to   occur?
                                                                        the

                                            Potential              happens   customer   occurs?
                                       What was the FMEA creation date?  What is the date of the last revision?   Failure   Effect   What   to the   if the   failure
                                What is the product or process?   Who is on the Six Sigma team?
                                  Who prepared the FMEA?
                                            Potential   Failure   Mode   What   could go   wrong?   What   might the   customer   not like?


                                                                 Describe


                                                                   the  ®
                                •   •   •   •   •   Function   Team-Fly   process   or   product   being   analyzed.   (A row   number is   often   assigned.)
   116   117   118   119   120   121   122   123   124   125   126