Page 355 - Trenchless Technology Piping Installation and Inspection
P. 355

No deduction,   assuming a proper   seal is achieved   at each end and   lateral. If contractor   chooses not to   dig and replace,   a deduction can   be applied for the




           N/A                          reach.†  N/A



           Tape should be   removed to prevent   potential flow   blockage.  If leaking   1.  between the   existing pipe and   the CIPP, inject a   hydrophilic type   grout to stop the   leakage.  If no leakage,   2.  a cementitious   grout can be   used to fill the   space.  In groundwater   situations install   a hydrophili







                    Should be repaired






           N/A         if leaking               N/A









           N/A      N/A                         N/A               ∗ Wrinkles/fins/folds are diameter dependent, for example, 1/4-in. is a small wrinkle especially in medium and large CIPP. † Contractors may choose to offer a deduction if the product does not meet the specification and is not acceptable to owner.

           Seam tape inadequately   bonded during   manufacture.  Insufficient pressure   1.  to fully expand the   liner.  The end of the liner   2.  was not pulled   sufficiently into the   manhole for full   expansion at the   manhole face.  A factor of existing   3.  pipe geometry.  Small gap between   liner and existing













           Seam tape,   loose, blistered   or leaking  Annular space   between existing   pipe and liner   at manhole/   annular space   (AS)  Ground water   leakage between   the liner and   existing pipe at   the manhole  Adapted from NASSCO  TABLE 7.10







                                                                    305
   350   351   352   353   354   355   356   357   358   359   360