Page 457 - Trenchless Technology Piping Installation and Inspection
P. 457
Acronyms and Abbreviations 407
Description
LDPE Low density polyethylene
LOR Localized repair
L-PB Lateral pipe bursting
LR Lateral renewal
MAOP Maximum allowable operating pressure
MDPE Medium density polyethylene
MH Manhole
MJ Mechanical joint
MOP Manual of practice
MSL Modified sliplining
MT Microtunneling
MTBM Microtunnel boring machine
MTM Manhole-to-manhole
O&M Operation and maintenance
OC Open-cut
OD Outside diameter
OP Open profile
PACP Pipeline assessment certification program
PB Pipe bursting
PB-HY Pipe bursting–hydraulic
PB-PE Pipe bursting–pneumatic
PB-PS Pipe bursting–pipe splitting
PB-ST Pipe bursting–static
PCCP Prestressed concrete cylinder pipe
PCP Polymer concrete pipe
PE Polyethylene
PJ Pipe jacking
PL Panel lining
PM Piercing method
PP Polypropylene
PPE Personal protection equipment
PR Pipe ramming
PRS Pipe replacement systems
PRM Pipe reaming