5-16   WATER AND WASTEWATER ENGINEERING

                              The following example illustrates the complete design of the storage and handling system for one
                            chemical.

                              Example 5-4.  Design the coagulant chemical handling and storage system for Boiling Water,
                            Arizona using the following design data:
                                                                      3
                                    Average daily design flow rate     38,000 m  /d
                                   Coagulant     ferric chloride
                                   Maximum dosage     50 mg/L as FeCl  3
                                   Shipping time     1 week
                                   Summer temperature frequently exceeds 40 	 C

                              Solution:
                                  a.  Off-loading piping
                                    From  Table 5-5, select a 100 mm diameter schedule 80 PVC pipe with a notation to

                                   check manufacturer’s data for temperature limitations.
                                 b.  Storage tank
                                   (1)  From Appendix A select FRP for tank material. The tank should be located indoors
                                       in a cool location.
                                   (2)   From Appendix A, note that ferric chloride is shipped as a 40% solution with
                                       100% active ingredient. At the maximum dosage, the daily mass of ferric chloride
                                       used is
                                                                     3
                                                                3
                                                          ,
                                               (50 mg/L )(38 000 m /d )(10 L/m 3 )(10   6  kg/mg) 1 900 kg/d
                                                                                         ,
                                                                                     )
                                   and the mass of solution required is
                                                             1 900 kg/d
                                                              ,
                                                                          4750 kg/d
                                                                          ,
                                                                040
                                                                 .
                                   (3)   Noting, from  Table 5-1 , that coagulants are noninterruptible, the volume to be held
                                      in two tanks for redundancy is 30-days supply plus two times the shipping time.
                                                     (4750 kg/d )(30 d    ( )(7d    209 0000 kg
                                                                       2
                                                                            ))
                                                       ,
                                                                                   ,
                                   (4)   Using the density of ferric chloride from Appendix A, the volume of solution to be
                                      stored is
                                                              ,
                                                          209 000 kg                 3
                                                                          .
                                                                    3    145 14 or  150 m
                                                          1 440 kg/m
                                                           ,
                                 c.  Feeder
                                    Two feeder pumps are required to meet redundancy requirements.
                                    From  Table 5-3 , a piston metering pump with PVC or PE coated piston is selected.
                                   Checking the capacity