THE DESIGN AND CONSTRUCTION PROCESSES 1-25

                   The capital cost for each of the membrane alternatives is now estimated to be an
                   additional $500,000. Is the Membrane A alternative still the best choice? Use the
                   interest rate and design life from Problem 1-1.

                1-3.    In the design of a water treatment plant, the design engineer has a choice of selecting
                   a constant speed pump or a adjustable-frequency drive (AFD) pump. The capital and
                   operating costs for each pump are shown below. Assume an interest rate of 6.00%
                   and a 10 year life. Which pump should the engineer recommend?


                         Option                    Capital cost       Annual electric cost

                         Constant speed pump         $10,000              $16,000
                         AFD pump                    $20,000              $10,000



                      1-4.    Using a spreadsheet you have written, by trial and error determine the construction
                   cost of Alternative B in Table 1-5  that will make its total annual cost equal to the
                   total annual cost of Alternative A. With the significant figures given, the costs may
                   be assumed to be “equal” when they are within $1,000 of each other. Note: the
                   interest during construction and inflation prior to construction used in Table 1-5
                   was 3.00%.


            1-10      DISCUSSION QUESTIONS

                 1-1.    The city engineer has called your firm to ask that you review the design of a sewer
                   that has had periodic flooding. The design was performed by another consulting firm
                   in the community. What actions should you take before accepting the job?
                1-2.    The professional organization that you belong to has been offered the opportunity to
                   meet in the facilities of a local casino free of charge. As the person in charge of
                   arrangements, what action would you recommend to the executive committee of your
                   organization?
                1-3.    A small community of lakefront homes believes that the algae bloom in their lake is
                   the result of leaking septic tanks and tile fields. They retained an engineering firm
                   to explore alternatives for building a collection system and wastewater treatment
                   plant. An exhaustive feasibility study of alternative wastewater treatment systems
                   to replace the existing septic tank and tile field system has been completed. The en-
                   gineering firm has recommended a sewer system and a wastewater treatment plant
                   to be operated by the community. After the report and recommendation to build has
                   been accepted by the client, the Department of Natural Resources and county health
                   department provide a report that declares that the existing system does not contribute
                   to pollution of the lake and the likely source of pollution is upstream agricultural
                   runoff. Should the engineering firm pursue the development of a wastewater
                   treatment system? Explain your reasoning.