Page 80 - Well Control for Completions and Interventions
P. 80

Well Construction and Completion Design                       71












              Figure 2.4 Slotted liner. Source: Image courtesy of Euroslot.




















              Figure 2.5 Predrilled or slotted liner completion. Left: Single zone. Right: Multiple
              zone with ECP or swell packer zonal isolation.




              Table 2.2 Predrilled and slotted liner completions summary
              Advantages                      Disadvantages
              Relatively cheap—elimination of  Water or gas entry difficult to control
                cementing costs (and time)      unless external casing packers or
                                                “Swell” packers are used
              Elimination of perforating costs  Not easy to selectively stimulate
                                                different parts of the producing
                                                interval unless ECP’s or swell packers
                                                are used
              Slots can be sized to give a degree of  Mud filter cake very difficult to remove
                sand control in course sand     and can leave residual damage
                formations
              Some degree of borehole stability  Reduction in diameter over producing
                achieved                        interval
                                              Some production logs difficult to
                                                interpret—at worst they become
                                                meaningless
   75   76   77   78   79   80   81   82   83   84   85