Page 367 - Fluid Power Engineering
P. 367

Index   327


              National Research Council, 248,  P95, 164
                 266                       P99, 164
              National Telecommunications  Pay-as-you-go, 295
                 Information               Payback period, 125, 165,
                 Administration, 265–266       286–287
              National Weather Service,    Payment-in-lieu-of-taxes, 281
                 263                       Permanent magnet, 176,
              Natural gas, 4, 222–223, 247     201–204, 207–210, 216–217,
              NCAR, 91, 112–114, 126–129,      225, 231
                 131, 136, 140             Permitting, 252, 254, 302, 304,
              Net after-tax cash flow, 286–287  307, 309
              Net present value, 165, 283,  Phase angle, 202–204, 211
                 285                       Pitch angle, 46, 69, 177
              Net-metering, 270, 272–273   Pitch mechanism, 73, 169,
              Newton’s second law, 14, 16, 23,  177–178, 216
                 48                        Planetary gears, 178–179
              NEXRAD, 263                  Point of common coupling, 232,
              Noise, 244, 247–248, 254–257,    279
                 259–260, 306–307          Post-tensioning systems, 278
              Non-spinning reserves, 222   Power coefficient, 19–20, 49–51,
              Normal turbulence model, 101,    61–62, 64, 66–68, 70, 72
                 185                       Power density, 30–33, 105,
              Normal wind profile, 185–186,     145
                 188                       Power electronics, 69–70, 210,
              NREL, 96, 190, 277               216, 218, 225, 231, 240
                                           Power factor, 191–194, 207–208,
                   O                           217, 229–231
              Obstacles, 91, 116–118, 122, 126,  Power law, 33, 87, 188
                 262                       Power performance curves,
              Obstruction Evaluation/Airport   63–64, 70
                 Airspace Analysis, 260    Power purchase agreement
              Offshore, 5, 107, 120, 154, 248,  (PPA), 240, 270, 306
                 272                       Power quality, 190, 232, 245
              Operating Costs, 269, 279    Prandtl’s tip loss factor, 66
              Operations and maintenance   Pressure drag, 57–59
                 (O&M), 190, 281, 283, 285,  Production tax credit, 275,
                 313, 320                      282–283, 285, 287–288, 297
              Opti slip, 215, 217          Propeller anemometer, 77
              Optimal layout, 156–158      Prospecting, 111–116, 123, 125,
              Organizational structure, 269    301–303
              Overspeeding, 86, 88, 164    Protection system, 171, 190, 221,
                                               225, 236–237, 241, 309
                   P                       Public outreach, 307
              P50, 164                     Public Utility Regulatory Policy
              P84, 164                         Act, 270
              P90, 164                     PWM inverter, 209
   362   363   364   365   366   367   368   369   370