72  Steam turbines and  gearing

                 checked  to  be  closed,  the  condensate  recircuiation  valve  after  the  air
                 ejector  should  be closed, and  the  astern  steam  valves  tightly closed,

                 Port arrival

                 Prior to arriving at a port the bridge should  provide  one to two hours'
                 notice  to  enable  the  turbines  to  be  brought  down  to  manoeuvring
                 revolutions.  A  diesel  alternator  will  have  to  be  started,  the  turbo-
                 alternator shut down, and  all the  full  away  procedure  done  in  reverse
                 order.